Framework of Construction Procedure Manuals for PMIS Implementation

         

摘要

Primarily project procedure manuals are intended to enforce company polices or procedures. These manuals are important pieces for successful project management in the construction industry,because construction projects are operated virtually. Even though subcontractors are responsible for field works,a general contractor is still responsible for providing quality project management services for project owners. The more subcontractors involved,the harder it is to monitor and control them, due to the different management processes and procedures they use. More than 36 procedure manuals in the building and industrial construction were reviewed to create process maps of various management services. According to surveys, larger contractors have a broader use of procedure manuals than smaller contractors. The full-scale manuals cover project administration, schedule, cost, contract administration, quality, or safety to home office operations. The small-scale manuals cover from site mobilization, to startup and closeout. Small-scale operation manuals are often used by medium to small contractors. This paper presents suggestions for integrated procedure manuals for construction management firms based on studies of multiple construction procedure manuals. A framework for integrating procedure manuals is presented. The proposed framework can be used to keep uniformity across management procedures and phases. In addition, it can be used to implement a project management system. It can be used to forecast or evaluate management activities through replicability of the management responses.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号