首页> 中文期刊> 《建筑环境与结构工程研究(英文)》 >Motion Analysis of PLET during the Setting-Down Process

Motion Analysis of PLET during the Setting-Down Process

         

摘要

The design analysis of Subsea PLET should consider various cases,including in-place analysis,lifting analysis,setting down analysis and so on.The size and vessel space should be checked in the structural design,and the fishing protection function should also be covered.The accurate setting-down process is the prerequisite for the successful construction of the subsea project.Therefore,it is necessary to simulate the various conditions included in the setting down process.Based on practical YC13-1 project and subsea environment condition,a special type of subsea PLET is designed for the pipe rehabilitation.Theoretical study is performed to discuss the load and Fluent software is used to simulate the problems encountered in the setting-down process.Comparison on the calculation results with ROV condition and without ROV condition,it indicates the effective suppression of the movement of PLET with ROV tractive action.The study can be a good reference and guidance for the design and construction of South China Sea oil and gas field project。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号