谢庄变电站为中平能化集团电务厂枢纽变电站。通过对110 kV、35 kV、6 kV变电站改造前、后进行对比分析,其一次系统增加了设备间隔。经技术改造后,变电站内操作更加灵活,系统运行更加可靠。%Xiegezhuang transformer substation is the junction substation of power plant factory of China Pingmei Energy and Chemical group.By comparison and analysis of 110 kV,35 kV,6 kV transformer substation before and after technology transformation,the once system increases equipment interval.By technology transformation,the operation of transformer substation performs more flexible,the system operates more reliable.