Safety-critical system (SCS) has highly demand for dependability, which requires plenty of resource to ensure that the system under test (SUT) satisfies the dependability requirement. In this paper, a new SCS rapid testing method is proposed to improve SCS adaptive dependability testing. The result of each test execution is saved in calculation memory unit and evaluated as an algorithm model. Then the least quantity of scenario test case for next test execution will be calculated according to the promised SUT's confidence level. The feedback data are generated to weight controller as the guideline for the further testing. Finally, a comprehensive experiment study demonstrates that this adaptive testing method can really work in practice. This rapid testing method, testing result statistics-based adaptive control, makes the SCS dependability testing much more effective.
展开▼
机译:Safety-critical system (SCS) has highlydemand for dependability, which requires plenty ofresource to ensure that the system under test (SUT)satisfies the dependability requirement. In this paper, anew SCS rapid testing method is proposed to improveSCS adaptive dependability testing. The result of each testexecution is saved in calculation memory unit andevaluated as an algorithm model. Then the least quantityof scenario test case for next test execution will becalculated according to the promised SUT's confidencelevel. The feedback data are generated to weightcontroller as the guideline for the further testing. Finally,a compre- hensive experiment study demonstrates thatthis adaptive testing method can really work in practice.This rapid testing method, testing result statistics-basedadaptive control, makes the SCS dependability testingmuch more effective.
展开▼