In the three-wire welding system,a welding process consists of the operations of four devices,namely three welding machines and one bogie.The operations need to be synchronized by a numerical coordinate controller(NCC).In this paper, we will discuss a task-job-procedure cubic program structure.Under this structure,the devices are synchronized and isolated at the same time.This cubic program structure can also be used as a reference for other multi-device or multi-unit manufacturing processes.
展开▼
机译:“Programa de Sande da Familia”(家庭健康计划)在Marechal deodoro-al,巴西(Profeta De Sande Da Familia)(Programa de Sande Da Familia)(Programa de Sande Da Familia)(Programa de Sande Da Familia)(Programa de Sande Da Familia“(Programa de Sande Da Familia)(Profeta De Sande Da Familia)(Profeta Deodoro-al,巴西)进行了研究(Vol 101,PG 312,2020)