@@ IntroductionrnBy the end of 1990, Daqing Oilfields had been producing for 30 years with water flooding. The composite water cut was as high as 79%. In the general regularity of developing large scale sandstone reservoirs,the oilfields had been in their later stage of production, characterized by rapid decline of oil output. It is very difficult to keep a steady oil production without any breakthrough in oilfield development technologies.
展开▼