首页> 中文期刊> 《中国原子能科学研究院年报:英文版》 >CⅡEngineering Project Passed Completion Acceptance

CⅡEngineering Project Passed Completion Acceptance

         

摘要

CⅡengineering project involves the design and technical services of a reactor electric power supply system,which responds to the requirement of foreign client.The content of this project mainly covers three aspects including Class 1E Low Voltage AC System,Class 1E Low Voltage DC System,

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号