To build a sheet-pile revetment in the sea area of a completed yacht marina,the possibility to drive sheet piles on water was ruled out. With the innovation and optimization of the construction technology,the strict control of the corner angle of each sheet pile to make a curve-shape of the coastline and the deviation of sheet piles to meet the landscaping requirements was solved,thus implementing the criteria of adaptation to the local conditions and achieving greater, faster, better and more economical results.%在已建成游艇码头区域进行板桩护岸施工,排除了水上施工的可能性。通过工艺创新和优化,解决了曲线造型的岸线需要严格控制每根板桩的转角,以及景观效果要求严格控制板桩的偏位等问题。体现了因地制宜,多快好省的原则。