中国人寿研发中心F-05地块(数据中心)工程屋面保温层采用泡沫混凝土整体浇筑技术.施工中从基底清理、混凝土浇筑、面层压光、养护等方面进行处理,保证了面层保温隔热效果.%Foamed concrete integral pouring technique is adopted in the insulating layer on roof of China Life Center F-05 Block ( Data Center ) project. During construction, heat insulation effect of the surface layer is ensured through substratum cleaning, concrete pouring, press-polishing of surface layer and nursing, etc.