Summary of Mechanical Group Work in 2017

         

摘要

In the year 2017,Mechanical group is responsible for both maintenance HIRFL system and tasks from new facilities and projects,Such as HIAF,CiADS in Guangdong province,LEAF instrument project,and SESRI from Harbin Institute of Technology.All those works need us to design,analysis,maintenance of mechanic structure of accelerator components.In addition,drawing layouts for new facility and part of design works of civil construction have been done.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号