首页> 外文学位 >Comparing Claims and Disputes Performance Between Traditional Project Delivery Method and Alternate Project Delivery Methods
【24h】

Comparing Claims and Disputes Performance Between Traditional Project Delivery Method and Alternate Project Delivery Methods

机译:比较传统项目交付方法和替代项目交付方法之间的索赔和争议表现

获取原文
获取原文并翻译 | 示例

摘要

Claims and disputes are common in construction projects and the costs associated with these adversarial relationships can reach up to $4-12 billion per year. While previous studies have indicated that project delivery methods (PDMs) might impact the frequency and severity of claims and disputes on construction projects, none provided any empirical evidence to support this perception, especially as related to the claim types in different project delivery methods. To address this issue and explore the different variables that might affect claims and disputes among many other project performances metrics, this empirical study was initiated. Data was collected by distributing a questionnaire to Departments of Transportation (DOTs) across the transportation sector. The data was analyzed using descriptive and inferential statistics. Results showed that while PDMs, procurement, and contractual methods have no significant impact on the claims and disputes performance, PDMs can impact other factors (e.g. contractor's performance and trust). These significant findings provide opportunities for further research in other areas such as trust and partnering, which were proven to strategically act as indirect mitigation practices to claims and disputes occurrence in construction projects. The research can also be used by practitioners to further understand the real reasons behind claims and disputes, avoid their triggers, and build a good model of trust for claims and disputes avoidance.
机译:索赔和纠纷在建筑项目中很常见,与这些对抗性关系相关的成本每年可能高达4-12亿美元。尽管先前的研究表明,项目交付方法(PDM)可能会影响建设项目中索赔和争议的发生频率和严重性,但没有一个提供任何经验证据来支持这种看法,尤其是与不同项目交付方法中的索赔类型相关的证据。为了解决此问题并探讨可能影响索赔和其他许多项目绩效指标之间争议的变量,我们启动了这项实证研究。通过向整个运输部门的运输部(DOT)分发调查表来收集数据。使用描述性和推断性统计数据对数据进行了分析。结果表明,虽然PDM,采购和合同方法对索赔和争议绩效没有重大影响,但PDM可能会影响其他因素(例如承包商的绩效和信任)。这些重大发现为在其他领域(如信任和合作伙伴)进行进一步研究提供了机会,这些领域被证明具有战略意义,可以间接缓解建设项目中的索赔和纠纷。从业人员也可以使用该研究来进一步了解索赔和纠纷背后的真正原因,避免其诱因,并为索赔和避免纠纷建立良好的信任模型。

著录项

  • 作者

    Bashettiyavar, Gautham.;

  • 作者单位

    Colorado State University.;

  • 授予单位 Colorado State University.;
  • 学科 Civil engineering.
  • 学位 M.S.
  • 年度 2018
  • 页码 187 p.
  • 总页数 187
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号