Liquidated damages clauses in construction contracts: A study of the application preference of the three-prong test by the appellate court system.

机译:建筑合同中的违约金条款:上诉法院系统对三管齐下测试的应用偏好的研究。

获取原文
获取原文并翻译 | 示例

摘要

The purpose of this study was to test each test prong of the three prong test courts utilize to assess the validity of a liquidated damages clause in a construction contract. One hundred seventy-five cases were reviewed by six research investigators. The cases were reviewed to determine whether the intent test, difficulty test, and reasonableness test were applied by the court and if so, whether each test was applied at time of contract, time of trial, or at time undefined.;The test results demonstrated that the courts display an application preference for the difficulty test and reasonableness test in that order. Currently, the intent test is not a test measurement employed by the courts in the enforceability question of a liquidated damages clause. The results further indicate that the difficulty test and reasonableness test were applied most often at time of contract.
机译:本研究的目的是测试三个插脚测试法院中每个插脚的使用情况,以评估建筑合同中违约金条款的有效性。六名研究人员对175例进行了审查。对案件进行了审查,以确定法院是否进行了意图测试,难度测试和合理性测试,如果是,则在合同订立,审判时间或未定义的时间进行每种测试;测试结果表明法院按顺序显示对难度测试和合理性测试的申请偏好。目前,意图测试不是法院在违约金条款的可执行性问题中采用的测试度量。结果还表明,在签约时最常使用难度测试和合理性测试。

著录项

  • 作者

    Jensen, Donald Albert, Jr.;

  • 作者单位

    Texas A&M University.;

  • 授予单位 Texas A&M University.;
  • 学科 Management.;Law.
  • 学位 Ph.D.
  • 年度 1993
  • 页码 258 p.
  • 总页数 258
  • 原文格式 PDF
  • 正文语种 eng