Computer-based hybrid model for estimating tunneling excavation productivity.

机译:基于计算机的混合模型,用于估算隧道开挖生产率。

获取原文
获取原文并翻译 | 示例

摘要

This thesis presents a computer-based hybrid model to simplify the process of estimating tunneling excavation productivity. This model combines Artificial Neural Networks (ANN), Knowledge-Based Expert Systems, and Discrete Event Simulations for improving the computational process. The model predictions of tunnel excavation rates closely match the rates achieved in a set of tunnel projects excavated using drill and blast and tunnel boring machines. The model has been implemented using commercial software.
机译:本文提出了一种基于计算机的混合模型,以简化估算隧道开挖生产率的过程。该模型结合了人工神经网络(ANN),基于知识的专家系统和离散事件模拟,以改善计算过程。隧道开挖速率的模型预测与使用钻机,爆破和隧道掘进机开挖的一组隧道项目中实现的速率非常匹配。该模型已使用商业软件实现。

著录项

  • 作者单位

    Worcester Polytechnic Institute.;

  • 授予单位 Worcester Polytechnic Institute.;
  • 学科 Engineering Civil.; Artificial Intelligence.
  • 学位 Ph.D.
  • 年度 1998
  • 页码 349 p.
  • 总页数 349
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;人工智能理论;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号