A formal approach for managing facility change information and capturing change history as part of building information models (BIMs).

机译:一种正式的方法,用于管理设施变更信息并捕获变更历史,作为建筑物信息模型(BIM)的一部分。

获取原文
获取原文并翻译 | 示例

摘要

This research specifically addresses two challenges associated with the current approaches of maintaining facility information. First, records of the work done are incomplete and inaccurate since changes happening to a facility as a result of daily maintenance and repairs are not captured systematically. As a result. facility information cannot be updated regularly and remains outdated. Capturing information about the work performed and resulting changes is challenging, since information items necessary to be recorded after each maintenance and repair work vary based on the nature of the work. Thus, a formal approach is needed to identify the information necessary to be captured in relation to changes and to streamline capturing changes during operations. Such an approach should be able to provide history of changes to facility maintenance personnel and help in updating facility information. Second. facility information remains outdated due to additional expenses (added to facility operation costs) and efforts needed for updating existing documents. and as the decisions on when to update facility information are ad-hoc. Updating facility information is challenging because a complete history is not available and as there are limited approaches for leveraging change history for deciding when to update. Such change history is necessary to support decisions of when to update for reducing update frequencies, and to provide the necessary information for the updates without the need for re-collecting the change information. Therefore, a formal approach is necessary for analyzing the patterns of changes and the work performed in a facility. in order to streamline the identification of the update needs in support of facility information updates and update frequency reduction. Such an approach should be able to assist in identifying the problems in the facility that need attention, based on the history, for supporting maintenance planning and prioritizing.;In order to address challenges and needs stated above. I developed a formalism for: (I) customized capturing of facility change information in relation to maintenance and repair work; and (2) analysis of the M&R work change history in a model-based facility information repository to spatially query changes and M&R work information for supporting update need recognition and maintenance planning. The objectives of the work included: (I) identification and classification of information that is necessary to be collected in relation to M&R work and facility changes; (2) development of customized information capture templates for recording M&R work changes in the field, and (3) identification and development of representation and reasoning approaches for linking and analyzing M&R changes with a BIM, in order to support identification of patterns for model update needs and M&R work planning.;The research methods involved an industry survey, formal case studies and direct observation of maintenance and repair process and facility documents, and current maintenance management systems (e.g., CMMS) for identifying and classifying information necessary to be captured in relation to M&R work and facility changes. It also included investigation and analyses of standards (e.g., WC, RS Means, COBie), and research approaches. Data collected during case studies and from digital maintenance records were used for classifying changes & M&R work and developing customized field data capture templates. Other research tasks/methods included prototyping for customized template generation and linking change history to BIM, reasoning about change history through queries and identifying clusters within BIM to identify BIM/facility information update needs and assist in maintenance planning. Validation studies included: (1) validating the coverage of the M&R change taxonomy and formalized templates by performing case studies and cross-comparison of change and maintenance data from different facilities; (2) validating the value of taxonomy and generality of the queries by user studies/interviews and prototyping. The user tests were performed with real FM personnel working in FMS departments and CMMS software providers, and graduate students who are doing research in the area. In these user-tests, participants demonstrated the prototype systems and answered a survey accordingly.;The contributions of the research include: (1) classification and capturing of facility changes associated with maintenance and repair work; (2) formalization of generation of customized templates for capturing field work and changes; (3) identification of useful/preferred queries for update needs; (4) querying M&R work and change history with BIM to support identifying patterns for model update needs. The expected practical implications include supporting of capturing of information in the field in relation to facility changes associated with M&R work and assisting in identifying spatial clusters of previous M&R work and changes for update need recognition and maintenance support. (Abstract shortened by UMI.).
机译:这项研究专门解决了与维护设施信息的当前方法相关的两个挑战。首先,由于没有系统地记录由于日常维护和修理而导致设施发生的变化,因此完成的工作记录不完整且不准确。结果是。设施信息无法定期更新,并且仍然过时。捕获有关已执行工作及其结果变更的信息具有挑战性,因为每次维护和修理工作后需要记录的信息项会根据工作性质而有所不同。因此,需要一种正式的方法来识别与变更有关的必须捕获的信息,并在操作过程中简化捕获变更的过程。这样的方法应该能够向设施维护人员提供变更的历史记录,并有助于更新设施信息。第二。由于额外的费用(添加到设施运营成本中)和更新现有文档所需的努力,设施信息仍然过时。并且,何时更新设施信息的决定是临时的。更新设施信息具有挑战性,因为没有完整的历史记录,并且利用变更历史记录来决定何时更新的方法有限。这种变更历史对于支持何时进行更新以减少更新频率的决定以及在不需要重新收集变更信息的情况下提供用于更新的必要信息是必要的。因此,需要一种正式的方法来分析变更的模式和设施中执行的工作。为了简化对更新需求的识别,以支持设施信息更新和减少更新频率。这种方法应能够根据历史记录,帮助确定设施中需要注意的问题,以支持维护计划和确定优先次序。为了解决上述挑战和需求。我开发了一种形式主义,用于:(I)自定义地捕获与维护和维修工作有关的设施变更信息; (2)在基于模型的设施信息存储库中对M&R工作变更历史进行分析,以空间查询变更和M&R工作信息以支持更新需求识别和维护计划。工作目标包括:(I)识别和分类与M&R工作和设施变更相关的必要信息; (2)开发用于记录现场M&R工作变化的定制信息捕获模板,以及(3)识别和开发用于通过BIM链接和分析M&R变化的表示和推理方法,以支持模型更新的模式识别需求和M&R工作计划。研究方法包括行业调查,正式案例研究以及对维护和修理过程及设施文件的直接观察,以及用于识别和分类在维护中需要捕获的信息的当前维护管理系统(例如CMMS)。与M&R工作和设施变更的关系。它还包括对标准(例如WC,RS Means,COBie)的调查和分析,以及研究方法。案例研究期间收集的数据和来自数字维护记录的数据用于对变更和M&R工作进行分类,并开发定制的现场数据捕获模板。其他研究任务/方法包括用于定制模板生成的原型制作以及将变更历史记录链接到BIM,通过查询对变更历史记录进行推理并确定BIM中的集群以识别BIM /设施信息更新需求并协助维护计划。验证研究包括:(1)通过进行案例研究以及来自不同设施的变更和维护数据的交叉比较,来验证M&R变更分类法和形式化模板的覆盖范围; (2)通过用户研究/访谈和原型验证分类法的价值和查询的一般性。用户测试是由FMS部门和CMMS软件提供商中的真正FM人员以及正在该领域进行研究的研究生进行的。在这些用户测试中,参与者演示了原型系统并相应地回答了调查。研究的贡献包括:(1)分类和捕获与维护和维修工作相关的设施变更; (2)正式生成用于捕获现场工作和变更的定制模板; (3)识别有用/首选的更新需求查询; (4)通过BIM查询M&R工作并更改历史记录,以支持识别模型更新需求的模式。预期的实际意义包括支持在现场获取与M&R工作相关的设施变更相关的信息,并协助识别以前的M&R工作的空间群以及为更新需求识别和维护支持而进行的变更。 (摘要由UMI缩短。)。

著录项

  • 作者

    Akcamete, Asli.;

  • 作者单位

    Carnegie Mellon University.;

  • 授予单位 Carnegie Mellon University.;
  • 学科 Engineering Civil.
  • 学位 Ph.D.
  • 年度 2011
  • 页码 185 p.
  • 总页数 185
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号