Evaluation of Utility Relocation Costs and Best Management Practices.

机译:公用事业搬迁成本评估和最佳管理实践。

获取原文
获取原文并翻译 | 示例

摘要

In recent years, the SCDOT has experienced a significant variation in estimated costs for the relocation of utilities on many projects. This has led to cost overruns and caused concerns for the district engineers responsible for the projects. Through meetings with SCDOT personnel and utility company representatives it was determined that a standardized cost estimate form combined with improved change order management and cost management strategies was needed. Recently submitted estimates were analyzed and rated by a panel on multiple criteria to generate a list of "poor", "good", and "excellent" estimates. The "excellent" estimates provided insight into the development of a standard estimate form and the deficiencies noted in all of the estimates were addressed in the standard form. The standardized cost estimate form should be simple, easy to use, and flexible for use on all types of utility relocation projects. An Excel spreadsheet was developed with line items for material, labor, and overhead costs. It is recommended that all utility companies on all utility relocation cost estimates submitted to the SCDOT use this format. This report presents five separate standardized estimate forms for power, communication, gas, water, and sanitary sewer utilities. This report also makes recommendations for improvements to the SCDOT's cost management database while utilizing cost management best practices. The main suggestion to improve the overall cost management process is to transition to a professional project management software such as Primavera P6 that can work seamlessly with the standardized estimate forms presented in this report, manage planned versus actual costs, search and sort data by any field, and generate useful cost and schedule reports.
机译:近年来,SCDOT在许多项目上的公用事业搬迁的估计成本上经历了很大的变化。这导致成本超支,并引起负责项目的地区工程师的担忧。通过与SCDOT人员和公用事业公司代表的会面,确定需要一个标准化的成本估算表,并结合改进的变更单管理和成本管理策略。小组根据多个标准对最近提交的估计值进行了分析和评级,以生成“差”,“好”和“优秀”估计值的列表。 “出色”的估算值可以帮助您深入了解标准估算表的开发过程,并且所有估算中指出的缺陷都可以通过标准格式解决。标准化的成本估算表应简单,易用且灵活用于所有类型的公用事业搬迁项目。开发了一个Excel电子表格,其中包含用于物料,人工和间接费用的行项目。建议所有公用事业公司在提交给SCDOT的所有公用事业搬迁成本估算中都使用此格式。该报告提出了五个单独的标准估计表,分别用于电力,通信,天然气,水和下水道公用事业。该报告还提出了在利用成本管理最佳实践的同时,改进SCDOT成本管理数据库的建议。改善总体成本管理流程的主要建议是过渡到专业的项目管理软件,例如Primavera P6,该软件可以与本报告中提供的标准化估算表无缝结合,管理计划成本与实际成本,按任何领域搜索和分类数据,并生成有用的成本和进度报告。

著录项

  • 作者

    Reinke, Michael D.;

  • 作者单位

    Clemson University.;

  • 授予单位 Clemson University.;
  • 学科 Civil engineering.;Transportation.
  • 学位 M.Engr.
  • 年度 2010
  • 页码 97 p.
  • 总页数 97
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号