首页> 外文学位 >The making and un-making of the San Francisco-Oakland Bay Bridge: A case in megaproject planning and decisionmaking.
【24h】

The making and un-making of the San Francisco-Oakland Bay Bridge: A case in megaproject planning and decisionmaking.

机译:旧金山-奥克兰湾大桥的建造与拆除:大型项目规划和决策中的一个案例。

获取原文
获取原文并翻译 | 示例

摘要

After over a decade of debate, construction of the San Francisco-Oakland Bay Bridge's eastern span finally began in 2002 at a current approximate cost estimate of {dollar}6 billion. The intense and controversial debate ranged from whether the bridge should be seismically retrofitted or replaced, how it should be designed, where it should be located, and how it should be funded. Decisions on these issues provided fertile ground for a highly contested process as public agencies at every level of government and mobilized groups and citizens participated and significantly altered the decision-making process. The design process also signified a fundamental change in how state and regional agencies plan and manage projects of this magnitude. This dissertation provides a detailed history and analysis of the new span's state and regional decision-making processes.; To guide this case study of a major transportation infrastructure project (also known as a "megaproject"), the research questions addressed are: What are the key characteristics and issues of debate for a major infrastructure project, such as the new Bay Bridge, and how do these impact policy decisions and project outcomes? These questions were designed to set the Bay Bridge case within a larger theoretical context while at the same time allowing the analysis to be of practical interest. This research contributes to the literature by knitting together the themes of megaproject planning, problem definition, agenda setting and policy implementation, as well as the "technological sublime," which details how large scale projects capture the public's attention and imagination. For the analysis, a megaproject typology and a conceptual framework focusing on megaproject characteristics and results are developed and applied to the Bay Bridge case. Lastly, several recurring themes throughout the bridge's development process are examined, including substantial conflicts over the project's purpose and definition; varying perceptions of crisis; and, disputes over accountability for cost overruns and delay that impeded the project's implementation.
机译:经过十多年的争论,旧金山-奥克兰海湾大桥东跨的建设终于在2002年开始,目前的估算费用约为60亿美元。激烈而有争议的争论范围包括桥梁是否应进行抗震翻新或更换,应如何设计,应在何处定位以及应如何筹集资金。有关这些问题的决定为高度竞争的程序奠定了沃土,因为各级政府的公共机构以及动员团体和公民都参与其中,并极大地改变了决策程序。设计过程还标志着州和地区机构计划和管理如此规模的项目的方式发生了根本变化。本文为新跨度的州和地区决策过程提供了详细的历史和分析。为了指导这个大型交通基础设施项目(也称为“大型项目”)的案例研究,所解决的研究问题是:大型基础设施项目(例如新的海湾大桥)的主要特征和争议问题是什么?这些对政策决策和项目成果有何影响?设计这些问题的目的是在更大的理论背景下设定海湾大桥的情况,同时使分析具有实际意义。这项研究通过将大型项目规划,问题定义,议程设置和政策实施以及“技术崇高”的主题紧密结合在一起,为文献做出了贡献。“技术崇高”详细描述了大型项目如何吸引公众的注意力和想象力。为了进行分析,开发了针对大型项目特征和结果的大型项目类型学和概念框架,并将其应用于海湾大桥案例。最后,研究了桥梁整个开发过程中反复出现的几个主题,包括与项目目的和定义存在重大冲突;对危机的不同看法;以及因成本超支和延误而引起的争议,这阻碍了项目的实施。

著录项

  • 作者

    Frick, Karen Trapenberg.;

  • 作者单位

    University of California, Berkeley.;

  • 授予单位 University of California, Berkeley.;
  • 学科 Transportation.; Urban and Regional Planning.
  • 学位 Ph.D.
  • 年度 2005
  • 页码 331 p.
  • 总页数 331
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 综合运输;区域规划、城乡规划;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号