首页> 外文会议>Your bridge to the future >Real World Shades of Gray in a Black and White Regulatory World
【24h】

Real World Shades of Gray in a Black and White Regulatory World

机译:黑白监管世界中的真实世界中的灰色阴影

获取原文
获取原文并翻译 | 示例

摘要

This paper is an update and follow-on from the paper titled "Resolving Roles & Risk in a Rapidly Changing Regulatory Environment" that was presented at a brief early bird session in Washington in 2001. It described the Engineers' Reports that every municipal water system in Ontario had to produce by May 2001. At the time of the Washington presentation, the Reports had been submitted but not reviewed. The review of those Reports is now being completed.rnThe utilities were mandated by regulation to complete the reports by a specific date and are paying for the Reports. The work had to be done by a registered professional engineer who is not an employee of the owner or the operator. The engineer had to sign a declaration that the Regulator could rely on the accuracy of the Report. The Regulator had the final say in the acceptability of the Reports, and based on them, issued new and consolidated "Certificates of Approval" for all the water systems involved.rnThis paper provides an update on the final outcomes of the process from a regulatory, utility and engineer's perspective. It describes the technical and policy issues that arose, and how all the parties worked within an already defined regulatory mandate to deal with them.rnRegulation is generally "black and white" and the real world is shades of gray - so the challenge in many cases was deciding which shades of gray were black and which were white. This was achieved using a variety of traditional and progressive mechanisms that involved fundamental decisions on impacts on small and large systems.
机译:本文是2001年在华盛顿举行的一次简短的早鸟会议上发表的题为“解决快速变化的监管环境中的角色和风险”的论文的更新和后续内容。它描述了工程师报告,每个市政供水系统安大略省必须在2001年5月之前完成该报告的制作。在华盛顿发表报告之时,报告已经提交,但未经审查。这些报告的审阅工作现已完成。根据法规,公用事业公司必须在特定日期之前完成报告并为报告付费。这项工作必须由注册的专业工程师完成,该工程师不是所有者或运营商的雇员。工程师必须签署一份声明,说明监管机构可以依靠报告的准确性。监管机构对报告的可接受性拥有最终决定权,并根据这些报告为所有涉及的水系统发布了新的合并的“批准证书”。rn本文提供了有关监管过程的最终结果的最新信息,实用程序和工程师的观点。它描述了出现的技术和政策问题,以及所有各方如何在已经定义好的监管任务中进行处理。rn监管通常是“黑白相间”,而现实世界是灰色阴影-因此,在许多情况下都是挑战正在决定哪些灰色阴影是黑色和哪些是白色。这是通过使用各种传统的渐进机制来实现的,这些机制涉及对小型和大型系统的影响的基本决策。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号