ENERGY MANAGER PROGRAM AT BC HYDRO

机译:卑诗水电公司能源经理计划

获取原文
获取原文并翻译 | 示例

摘要

The Energy Manager Program at the British ColumbiarnHydro and Power Authority (BCH) is designed torndedicate resources that identify and implement energyrnefficiency projects. The program provides funding to findrnenergy savings on customer sites. The Energy Managerrn(EM) resource was lacking in previous energyrnconservation programs and was a key barrier to customerrnacceptance. The EM program is part of a revivedrnDemand Side Management (DSM) effort to encouragerncustomers to reduce electricity use. The DSM initiative isrnneeded at this time to defer the capital cost of newrnelectricity generating capacity because in 7 years BCHrnwill have reached it generating capacity. The targetrnmarket was originally institutional customers and hasrnexpanded to include industrial, manufacturing andrnproperty management sectors. To date 40 EM’s havernassisted in identifying over 53,000 MW.h. Future plansrninclude rolling out the program to smaller customers withrn“Lite” version that will allow for modified deliverablesrnwith shorter work terms.
机译:不列颠哥伦比亚水电和电力局(BCH)的能源经理计划旨在精简识别和实施能源效率项目的资源。该计划提供资金以节省客户现场的能源。以前的节能计划缺少能源经理(EM)资源,这是客户接受的主要障碍。 EM计划是重新启动的需求方管理(DSM)工作的一部分,以鼓励客户减少用电量。此时需要DSM计划来推迟新发电能力的资本成本,因为BCHrn将在7年内达到其发电能力。目标市场最初是机构客户,并已扩大到包括工业,制造业和财产管理部门。迄今为止,已有40个EM协助确定了超过53,000MW.h。未来的计划包括使用“精简版”向较小的客户推广该计划,从而允许以较短的工作期限来修改交付的产品。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号