Treatment of Septic Wastewater with High Ammonia and Sulphide for Nutrient Removal – A Success Story at the Headingley Wastewater Treatment Facility

机译:高氨和硫化物处理化粪池污水以去除营养物–海德利污水处理厂的成功案例

获取原文

摘要

The new Headingley wastewater treatment facility (WWTF) was constructed to address severalchallenges faced by the existing treatment facility. This included the inability to handle septicwastewater from the Municipality, hydraulic overloading during wet weather events resultingplant bypasses and the inability to meet the effluent requirements for ammonia. Due tosignificant growth in the community and new provincial regulations for nitrogen andphosphorus, the Municipality in partnership with the Province of Manitoba decided to construct agreenfield WWTF. The new WWTF would require nutrient removal and accommodate a 20-years wastewater flow from the Municipality, Headingley Correctional Institute (HCI) and a newWomen’s Correctional Centre (WCC).In 2009, Penn-Co Construction teamed up with Stantec Consulting Ltd. (Stantec) to undertakethe design, construction and short-term operation of the Headingley WWTF via a Design-Build-Operate (DBO) delivery process. The project presented several challenges including highsulphides in the influent stream, poor soil conditions and stringent effluent requirements. Theconstruction of the project started in October 2009 and the plant was commissioned in June2011. To handle the septic wastewater stream and meet the plant effluent criteria, an innovativesulphide stripping system was implemented in conjunction with a Sequencing Batch Reactorsystem for secondary treatment. Waste activated sludge (WAS) is aerobically digested andhauled to a local landfill. This paper highlights the key design-build innovations for this projectand challenges associated with the construction, commissioning, operation of the WWTP alongwith plant performance data.
机译:新的Headingley废水处理设施(WWTF)旨在解决现有处理设施面临的若干挑战。这包括无法处理市政当局的化粪池废水,在潮湿天气事件中造成的水力超负荷,导致工厂旁路,以及无法满足氨水的排放要求。由于社区的显着增长以及新的省份氮和磷法规,市政府与曼尼托巴省合作决定建设一个绿地WWTF。新的WWTF将需要去除养分,并容纳市政当局,海丁利惩教所(HCI)和新的妇女惩教中心(WCC)长达20年的废水流量.2009年,宾夕法尼亚大学与斯坦泰克咨询有限公司(Stantec Consulting Ltd.)(Stantec)合作)通过设计-建造-运营(DBO)交付过程来承担Headingley WWTF的设计,建造和短期运营。该项目提出了一些挑战,包括进水中的高硫化物,恶劣的土壤条件和严格的废水要求。该项目的建设于2009年10月开始,工厂于2011年6月投入使用。为了处理化粪池废水并满足工厂出水标准,已实施了创新的硫化物汽提系统,并与定序分批反应器系统一起进行了二次处理。废水中的活性污泥(WAS)被需氧消化并运至当地的垃圾填埋场。本文重点介绍了该项目的关键设计,建造创新以及与污水处理厂的建设,调试,运行以及工厂性能数据相关的挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号