Lessons Learned in Design and Commissioning of Digester Gas CHP Energy Recovery Projects in a Design/Build Project Delivery Environment

机译:在设计/建造项目交付环境中进行沼气CHP能量回收项目设计和调试的经验教训

获取原文

摘要

The design/build delivery method for combined heat and power (CHP) systems has theadvantage of customizing CHP systems to meet Owner’s budget, compressing the design andconstruction schedule and providing the Owner a unified contactor/engineer team during start up.This paper is a case study for the design and commissioning associated with the 2.1 megawatt(MW) CHP system at the Gwinnett County F. Wayne Hill Water Resources Center (FWHWRC)and a 1.6 MW CHP system at the City of Atlanta R. M. Clayton WWTP. This paper willprovide the pros and cons from the Owner’s, Engineer’s, and Contractor’s perspective.
机译:热电联产(CHP)系统的设计/建造交付方法的优势在于定制CHP系统以满足业主的预算,压缩设计和施工进度并在启动过程中为业主提供统一的接触者/工程师团队。 Gwinnett County F. Wayne Hill水资源中心(FWHWRC)的2.1兆瓦CHP系统和亚特兰大RM Clayton污水处理厂的1.6 MW CHP系统的设计和调试研究。本文将从业主,工程师和承包商的角度提供利弊。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号