FULL SCALE STRESS TESTING OF THE A/O BIOLOGICAL PHOSPHORUS REMOVAL PROCESS

机译:A / O生物磷去除过程的全尺寸应力测试

获取原文
获取原文并翻译 | 示例

摘要

Consoer Townsend Envirodyne Engineers Inc. (CTE) was retained by the GeneseernCounty Drain Commissioner to perform a capacity evaluation study for the AnthonyrnRagnone Treatment Plant (ARTP). CTE found that secondary treatment capacity wasrnlimited to 25 MGD based upon the original design criteria of 1.2 hours of hydraulicrnretention time (HRT) in the anoxic zone of the A/O Biological Phosphorus RemovalrnProcess being used at the ARTP. However, an analysis of operating and effluentrnquality data indicated that the ARTP could produce effluent total phosphorusrnconcentrations below 1.0 mg/l at anoxic zone HRTs less than 1.2 hours. Therefore, itrnwas decided that a portion of the existing A/O process be full-scale stress tested underrnvarious HRTs to determine the true flow capacity of the existing ARTP secondaryrnsystem.rnThe stress test utilized two biological reactors and four clarifiers which were isolatedrnfrom the rest of the secondary plant of the ARTP. The average HRTs tested in thernanoxic and aerobic zones ranged from 1.0 to 0.66 hours and 7.01 to 4.59 hoursrnrespectively.rnBased upon the results of the full-scale stress test conducted at the ARTP and datarnfrom the scientific literature, the A/O process can be successfully operated at thernARTP at an HRT in the anoxic zone of 1.0 hour and on HRT in the aerobic zone of 7.0rnhours. The effluent data collected during the stress test demonstrated that the ARTPrncan meet effluent limits of 0.5 mg/l of Total Phosphorus and 0.5 mg/l of ammonianitrogenrnat these HRTS. Based upon the results of the stress test, the secondaryrncapacity of the ARTP can be increased from 25 to 30 MGD.
机译:Consoer Townsend环境工程师有限公司(CTE)被GeneseernCounty排水专员聘用,以进行AnthonyrnRagnone处理厂(ARTP)的产能评估研究。 CTE发现,根据ARTP所使用的A / O生物除磷工艺的缺氧区域中的水力保留时间(HRT)1.2小时的原始设计标准,二级处理能力被限制为25 MGD。但是,对运行和废水质量数据的分析表明,ARTP在缺氧区HRT少于1.2小时的条件下,废水总磷浓度可低于1.0 mg / l。因此,决定将现有A / O过程的一部分在各种HRT下进行全面压力测试,以确定现有ARTP二次系统的真实流量。压力测试使用了两个生物反应器和四个澄清池,它们与其余的分离ARTP的二级工厂。在缺氧和好氧区域中测试的平均HRT分别在1.0到0.66小时和7.01到4.59小时之间.rn根据ARTP进行的全面压力测试的结果以及科学文献的数据,A / O过程可以成功完成在theARTP的缺氧区HRT运行1.0小时,在有氧区的HRT运行7.0rnhour。在压力测试过程中收集的废水数据表明,在这些HRTS上,ARTPrn可以达到0.5 mg / l的总磷和0.5 mg / l的氨氮的排放限值。根据压力测试的结果,ARTP的二次容量可以从25 MGD增加到30 MGD。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号