首页> 外文会议>Waste management symposium;WM'04 >SAVANNAH RIVER SITE PUBLIC®ULATORY INVOLVEMENT IN THE TRANSURANIC(TRU)WASTE MANAGEMENT PROGRAM RESULTED IN DECISIONS TO ALLOW SMALL QUANTITY SITES TO SHIP TRU WASTE TO SRS&ACCELERATION OF THE SHIP-TO-WIPP PROGRAM
【24h】

SAVANNAH RIVER SITE PUBLIC®ULATORY INVOLVEMENT IN THE TRANSURANIC(TRU)WASTE MANAGEMENT PROGRAM RESULTED IN DECISIONS TO ALLOW SMALL QUANTITY SITES TO SHIP TRU WASTE TO SRS&ACCELERATION OF THE SHIP-TO-WIPP PROGRAM

机译:SAVANNAH河流在公共(TRU)废物管理计划中的公共和监管介入,​​导致决定允许小数量站点装运TRU废物以进行SRS并加速船舶到WIPP计划

获取原文

摘要

The key to successful public involvement at the Savannah River Site(SRS)has been and continues to be vigorous,up-front involvement of the public and state regulators with technical experts.We have found that just picking the best technical expert may not achieve success;however,we must choose experts who can speak to the public in easily understood language,making key technical and program points in a friendly,congenial manner.Many times the key to successful interaction is the interplay at breaks,before and after the meetings,and,yes,over lunch. This paper will describe the public involvement program that resulted in consensus and agreements to allow the SRS to receive transuranic(TRU)waste for storage from a small generator site outside of the state of South Carolina prior to shipment to the Waste Isolation Pilot Plan(WIPP)in New Mexico for disposal.The interaction between the stakeholders not only included the general public,but also the South Carolina Department of Health and Environmental Control(SCDHEC)and the South Carolina Governor’s office.The discussions,educational secessions,and negotiations included resolution of equity issues as well and moved forward to an understanding of the difficulties including risk management faced by the Ship-to-WIPP program.Once the program was better understood,the real negotiations concerning equity,safety,and acceleration of shipments could begin.The public involvement resulted in receipt of the TRU waste from the Mound Facility in Ohio based on acceleration of SRS shipments to WIPP.Further challenges are ahead and the process has continued to make sure the public and state regulators understand the significant challenges ahead and the barriers that need to be removed to continue shipping higher activity TRU waste to WIPP.
机译:在萨凡纳河站点(SRS)上成功进行公众参与的关键一直是,而且仍然是积极的,公众和州监管机构都需要技术专家的前期参与。但是,我们必须选择能够以通俗易懂的语言与公众对话,以友好,友善的方式提出关键技术和计划要点的专家。很多时候,成功互动的关键是会议前后的互动。是的,共进午餐。本文将描述公众参与计划,该计划产生了共识和协议,使SRS可以从南卡罗来纳州州以外的小型发电厂接收超铀(TRU)废物进行存储,然后再运送至废物隔离试验计划(WIPP)利益相关者之间的互动不仅包括公众,还包括南卡罗来纳州卫生与环境控制局(SCDHEC)和南卡罗来纳州州长办公室。讨论,教育分离和谈判包括决议也讨论了股权问题,并进一步理解了Ship-to-WIPP计划所面临的困难,包括风险管理。一旦对该计划进行了更好的理解,就可以开始有关公平,安全和发货加速的真正谈判。公众参与导致基于SRS向WIPP运送的加速,从俄亥俄州土墩工厂收到了TRU废物。其他挑战仍在继续,并且该过程将继续确保公众和州监管机构了解未来面临的重大挑战以及为继续将较高活性的TRU废物运送到WIPP而需要消除的障碍。

著录项

  • 来源
  • 会议地点 Tucson, AZ(US);Tucson, AZ(US)
  • 作者

    W.T.(Sonny)Goldston;

  • 作者单位

    Westinghouse Savannah River Company Aiken South Carolina 29808;

  • 会议组织
  • 原文格式 PDF
  • 正文语种
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号