Major embankment construction over soft foundation soils: Route 3 Country Park Section, Hong Kong

机译:软土地基上的大堤施工:香港三号干线郊野公园段

获取原文
获取原文并翻译 | 示例

摘要

Route 3 is a strategic expressway across the north-west New Territories of the Hong Kong Special Administrative Region (SAR) which was procured as a fast-track design and construct project. The Country Park Section north of Tai Lam Tunnel included extensive embankment formation over land occupied by large fish ponds and underlain by soft alluvial soils. Major geotechnical risk factors that had to be addressed included the stability and performance of these embankments. At an early stage it was recognised that the settlement of the foundation soils could be considerable and of a highly variable rate, with the stability during construction of the high embankments also being a concern. Another key factor was how to establish an appropriate point when pavement construction could commence, with the confidence that long-term settlements would be within acceptable limits. Design solutions based on a risk-management strategy were established, with it being determined that ground improvement, staged construction and surcharging were appropriate to best address the geotechnical risks. In response to the challenging construction programme, and recognising that the performance of the foundation soils might be better than predicted, it was also decided to adopt an "Observational Approach" to the earthworks construction. A series of performance criteria were established so that decisions and appropriate actions could rapidly be taken during construction and extensive instrumentation was therefore installed to control the works. Early agreement on the construction control criteria, responsibilities, and contingency measures between the Designer, Contractor and Project Manager, was a critical success factor for this fast-track project. This paper concentrates on the measured performance of the embankments during construction, specifically the pause periods that were required during staged construction, the response to surcharge loading and the trend of long term creep settlements. Particular benefits that accrued from the geotechnical approaches adopted in the project included significant shortening of the pause periods during and after construction of the embankments compared to the periods envisaged at design stage, as well as the earliest completion of pavement construction.
机译:三号干线是横跨香港特别行政区(新界)西北部的战略性高速公路,是作为快速设计和建设项目而采购的。大榄隧道以北的郊野公园段,在大鱼塘所占土地和柔软的冲积土之下的土地上,形成了广泛的堤岸。必须解决的主要岩土工程风险因素包括这些路堤的稳定性和性能。在早期阶段,人们认识到地基土的沉降可能是相当大的,并且变化率很大,高路堤在建造过程中的稳定性也是一个问题。另一个关键因素是如何在人行道施工开始时确定合适的地点,并确信长期沉降将在可接受的范围内。建立了基于风险管理策略的设计解决方案,确定了地面改善,分阶段施工和补给最适合解决岩土工程风险的方案。为应对具有挑战性的施工计划,并认识到地基土的性能可能会好于预期,因此还决定对土方工程采用“观测方法”。建立了一系列性能标准,以便在施工过程中可以迅速做出决定并采取适当的行动,因此安装了广泛的仪器来控制工程。设计者,承包商和项目经理之间就施工控制标准,职责和应急措施达成早期协议,对于这个快速项目来说是至关重要的成功因素。本文着重于施工期间路堤的实测性能,特别是分阶段施工中所需的停顿期,对附加荷载的响应以及长期蠕变沉降的趋势。该项目采用的岩土方法所带来的特别收益包括:与设计阶段所设想的时期相比,路堤施工期间和之后的停顿期大大缩短,而且路面施工最早完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号