【24h】

Abandonment of Tailings Deposit Casapalca

机译:放弃卡萨帕尔卡矿床尾矿

获取原文
获取原文并翻译 | 示例

摘要

The Tailing Deposit Casapalca is in the right of the Rimac River in Lima, Peru. It has 960,000 tons of tailings in 7.7 square hectometers. Physical stabilization design was: Reduce inclination of the banks by cut and conformation of embankments, and to reconstruct contention walls in the right riverbank of the Rimac. For handling of waters we constructed coronation and evacuation gutters. For chemical stabilization, the design contemplated the superficial cut of the rusty scab, its later neutralization, and the placement of the technical covering. This consists of an alkaline barrier, on which germicide was applied, of a layer of grievous clay and finally of a layer of organic earth, on which the vegetable covering was made. Abandonment was made in five months. It cost around 1 '820,000 US dollars without administration costs.
机译:尾矿床Casapalca位于秘鲁利马的Rimac河的右侧。它在7.7平方公顷的土地上有96万吨尾矿。物理稳定设计为:通过路堤的切割和整形减少河岸的倾斜度,并重建Rimac右河岸的竞争墙。为了处理水,我们建造了加冕和疏散排水沟。为了化学稳定,设计考虑了生锈结sc的表面切割,后来的中和以及技术覆盖物的放置。它由碱性屏障(上面施加了杀菌剂),一层黏土和最后一层有机土组成,在其上进行了蔬菜覆盖。在五个月内被遗弃。它的成本约为1'820,000美元(不含管理费用)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号