REDUCING DETAIL DESIGN and CONSTRUCTION WORK CONTENT BY COST-EFFECTIVE DECISIONS IN EARLY STAGE NAVAL SHIP DESIGN

机译:通过早期海军舰船设计中的成本有效决定来减少详细设计和建造工作量

获取原文
获取原文并翻译 | 示例

摘要

The Office of the Under Secretary of Defense, Acquisition, Technology and Logistics (AT&L)rnrecently presented analyses of cost and schedule growth on Major Defense AcquisitionrnPrograms (MDAPs) over the last 20 years (2013, 2014). For naval ships, AT&L (2013) concludedrnthat contract work content growth (not capability growth) dominates total cost growthrnstatistically. In addition, costs-over-target are significant and reflect poor cost estimation orrnfaulty framing assumptions. AT&L (2014) also concluded prices on fixed-price contracts are onlyrn“fixed” if the contractual work content remains fixed, but this is often not the case. The authorsrnshow that under-sizing the ship during concept design studies increases ship outfit density andrnadds complexities to the design. These early stage design decisions on sizing the ship are arnmajor contributor to unnecessary work content growth later in Detail Design and Constructionrn(DD&C) that cannot be eliminated no matter how productive the shipbuilder. However, newrnship design methods are being developed and integrated with legacy physics-based design andrnanalysis tools into a Rapid Ship Design Environment (RSDE) that will enable a more rationalrnprocess for initially sizing ships. The authors also identify the need for early stage designrnmeasures of complexity and ship costing tools that are more sensitive to these measures, andrnpropose solutions that will aid decision-makers in reducing DD&C work content by making costeffectiverndesign decisions in early stage naval ship design.
机译:国防,采购,技术和物流部副部长办公室(AT&L)最近介绍了过去20年(2013年,2014年)主要国防采购计划(MDAP)的成本和进度增长分析。对于海军舰船,AT&L(2013)得出结论:合同工作内容的增长(而非能力的增长)在统计上占总成本增长的主导。另外,超出目标的成本很重要,反映了较差的成本估算或错误的框架假设。 AT&L(2014)还得出结论,如果合同工作内容保持固定不变,则固定价格合同的价格只会“固定”,但事实并非如此。作者表示,在概念设计研究期间缩小船的尺寸会增加船的装备密度并增加设计的复杂性。这些有关船型尺寸的早期设计决策是导致详细设计和建造(DD&C)之后不必要的工作内容增长的主要因素,无论造船厂的生产率如何,都无法消除。但是,正在开发新的船舶设计方法,并将其与基于物理的传统设计和分析工具集成到快速船舶设计环境(RSDE)中,这将为初始确定船舶尺寸提供更合理的过程。作者还确定了对复杂性的早期设计措施和对这些措施更为敏感的舰船成本核算工具的需求,并提出了可通过在早期海军舰船设计中进行具有成本效益的设计决策来帮助决策者减少DD&C工作内容的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号