The Walker Springs Wood Treating site is an abandoned wood treating facility located near the city of Jackson, Alabama. Site soil was found to be extensively contaminated with creosote oil. Bench-scale studies were conducted to screen soils for creosote-degradative activity and to develop a nutrient recipe that would promote rapid degradation of creosote in pilot-scale and field-scale studies. Screening studies identified a site soil sample which contained microbial populations capable of removing almost 89% of target creosote components in 28 days. Recipes were subsequently developed which promoted the removal of 87% to 90% of target creosote components in 84 days in bench-scale solid-phase studies. In 1997, four pilot-scale land farm cells were constructed with individual capacities of 4.7 yd~3 (3.6 m~3) to evaluate recipes developed from bench-scale studies. Initial creosote concentrations in solid-phase studies ranged from 3,300 to 5,500 mg/kg. One of the recipes promoted the removal of over 94% of target creosote components in 90 days. A field-scale unit was constructed at the site with a capacity of 4,800 yd~3 (3,700 m~3). Almost two years (699 days) were required before creosote component removal achieved the end results obtained in bench-scale and pilot-scale studies.
机译:Walker Springs木材处理厂是位于阿拉巴马州杰克逊市附近的废弃木材处理设施。发现现场土壤被杂酚油广泛污染。进行了基准规模的研究,以筛选土壤中的杂酚油降解活性,并制定营养配方,以促进中试规模和实地研究中杂酚油的快速降解。筛选研究确定了现场土壤样本,其中包含能够在28天之内去除几乎89%的目标杂酚组分的微生物种群。随后开发了可在84天的台式规模固相研究中促进87%至90%的目标杂酚油成分去除的配方。 1997年,建立了四个中试规模的陆上农场单元,每个单元的容量为4.7 yd〜3(3.6 m〜3),以评估从基准规模研究中得出的配方。固相研究中的初始杂酚油浓度为3,300至5,500 mg / kg。其中一种配方可在90天内促进去除94%以上的目标杂酚油成分。在现场建造了一个现场规模的装置,容量为4,800 yd〜3(3,700 m〜3)。在将杂酚油成分去除达到基准规模和中试规模研究的最终结果之前,需要将近两年(699天)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号