Mine Planning and Risk Management Associated with the Breakthrough of theTelfer Sublevel Cave into the ActiveTelfer Open Pit

机译:与Telfer地下溶洞突入ActiveTelfer露天矿有关的矿山规划和风险管理

获取原文
获取原文并翻译 | 示例

摘要

The Telfer main dome open pit is operated by Newcrest Mining Limited at a current production rate of 50 Mt/a from a pit dimension compromising 2 km strike length, 1 km width and 250 m depth. As part of the refeasibility of the Telfer operation undertaken early this decade, Newcrest identified that an underground sublevel cave (SLC) operation along with an increased scale of open pit would support a new plant targeting the processing of gold and copper ore at 17 Mt/a rates. The SLC was initiated in late 2006 and broke into the open pit in late 2009. This situation is unique across the mining industry where a cave breakthrough was planned and occurred within an active large open pit operation. The SLC broke though into the west side of the Main Dome open pit into a specially prepared bench that was left at the 5384 RL of cut-back stage 3. A main haulage ramp is within 100 m from the edge of the cave breakthrough zone and this ramp passes down to the active levels which are progressing toward the 5200 RL. This paper presents insight into the mine planning and risk management associated with continued operation of the open pit operation while an active SLC breaks through. The cave breakthrough presents unique areas for risk management as there is potential for rapid propagation and subsidence. To support the undertaking, mine design and major hazard management planning has been carried out. Focus areas include; dual ramp system design, preloading the breakthrough area, monitoring of cave propagation and air gap using a seismic system and deep hole extensometers, wall stability and subsidence monitoring using radar and prism systems, and key trigger and response planning.
机译:Telfer主穹顶露天矿是由Newcrest Mining Limited以50 Mt / a的当前生产率生产的,矿坑尺寸损害了2 km的行进长度,1 km的宽度和250 m的深度。作为本十年初进行的Telfer作业可重复性的一部分,Newcrest认为地下地下洞穴(SLC)作业和露天矿规模的扩大将为新建一座以17 Mt /费率。 SLC于2006年底启动,并于2009年底进入露天矿。这种情况在采矿业中是独一无二的,在采矿业中,计划进行一次溶洞突破并在大型露天矿活动中发生。 SLC进入主穹顶露天矿的西侧,进入一个特殊准备的工作台,该工作台留在缩减阶段3的5384 RL。主运输坡道距离洞穴突破区边缘100 m以内,并且该斜坡向下下降到向5200 RL前进的有效水平。本文介绍了在积极的SLC突破时,与露天开采的持续运营相关的矿山计划和风险管理。洞穴的突破为风险管理提供了独特的领域,因为它具有快速传播和沉降的潜力。为了支持这项工作,已经进行了矿山设计和重大灾害管理计划。重点领域包括;双坡道系统设计,预加载突破区域,使用地震系统和深孔引伸计监控洞穴的传播和气隙,使用雷达和棱镜系统监控墙的稳定性和沉降以及关键的触发和响应计划。

著录项

  • 来源
  • 会议地点 Perth(AU)
  • 作者单位

    Senior Mine Planning Engineer, Newcrest Mining Limited, Telfer Gold Mine, Telfer WA 6762;

    Geotechnical Engineer, Newcrest Mining Limited Telfer Gold Mine, Telfer WA 6762;

    Planning Superintendent, Newcrest Mining Limited, Telfer Gold Mine, Telfer WA 6762;

    Principal Geotechnical Engineer, Newcrest Mining Limited, Telfer Gold Mine, Telfer WA 6762;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿山开采;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号