Boliden's Aitik open pit mine located in northern Sweden, will expand yearly production from 18 to 36 Mt of copper ore during 2010. The expansion includes a new concentrator located 3 km off the pit, two new apron feeder crushers connected to the ore storages and concentrator with conveyors at a total length of 7 km. The concentrator has two lines with autogenous grinding mills and flotation each with a capacity of 18 Mt. Consequently the mine operation has to be expanded. To achieve this, there was several parallel processes ongoing; investments in new equipment, reorganisations, improvement projects in maintenance and productivity. The Aitik 72 project was started to coordinate productivity and mine planning activities. Initially the long-term strategic mine plan called for a total movement of ore and waste to increase from 40 to 72 Mt but has today increased to 89 Mt. Productivity projects have been focused on load and haul activities such as fuel economics (Renstrom, 2007), effective utilisation of trucks partly by increasing manning levels, improved dispatch and shovel utilisation focusing on optimal use of loader/truck fleets. The eco-driving projects previously reported have reduced fuel consumption significantly. This project is also a productivity project, as part of the fuel savings comes from minimising idle engine hours due to queues, break-downs, operator shift changes, etc but also from under and overloading. Effective use of track fleets, ie transport of material, loading and dumping, thus excluding nonproductive engine hours has been an essential motivator when deciding the size and number of new trucks required. This has resulted in a reduction of the investment with at least one but maybe two tracks. A third major project was to optimise shovels together with track fleet by improving short-term, up to two weeks, detailed planning of drilling and shovel activities. Daily scheduled breaks for maintenance as well as planning of shovel utilisation, down to shift level are included in the production plans. KPIs and online production reports, based on real-time monitoring of drill rigs, shovels and tracks, have been an essential tool used regularly to engage and motivate mine production personal and information reporting to management. Several projects have already reached their goals. The projects will continue throughout 2010 to ensure that productivity targets are met.
机译:位于瑞典北部的Boliden的Aitik露天矿将在2010年将铜矿石的年产量从18 Mt扩大到36Mt。扩建包括位于矿坑外3公里处的新选矿厂,与矿库和选矿厂连接的两台新的停机坪给料破碎机输送机总长度为7公里。该选矿厂有两条流水线,分别是自磨机和浮选机,每条流水线的容量为18Mt。因此,必须扩大矿山的运营。为了实现这一目标,正在进行多个并行过程。在新设备,重组,维护和生产力改善项目上进行投资。 Aitik 72项目已开始,以协调生产力和矿山计划活动。最初,长期战略性矿山计划要求矿石和废物的总迁移量从40吨增加到72吨,但今天已增加到89吨。生产力项目一直侧重于装载和运输活动,例如燃料经济性(Renstrom,2007年),部分通过提高人员配备水平来有效利用卡车,改进调度和铲土利用,重点是优化装载机/卡车车队。先前报道的环保驾驶项目已大大降低了燃油消耗。这个项目也是一个生产力项目,因为节省燃油的一部分来自最大限度地减少由于排队,故障,操作员轮班变更等导致的怠速发动机工时,还来自欠载和超载。在确定所需的新卡车的尺寸和数量时,有效利用轨道车队,即运输物料,装载和倾倒,从而排除非生产性的发动机小时,一直是一个重要的动机。这导致投资减少,至少减少了一条,但可能减少了两条。第三个主要项目是通过改善短期(长达两周)的详细钻探和铲土活动计划来优化铲土和轨道车队。生产计划中包括每日计划的维护时间以及铲具使用计划,直至下班。 KPI和在线生产报告基于对钻机,铲子和轨道的实时监控,已成为定期用于吸引和激励矿山生产人员和向管理人员报告信息的重要工具。几个项目已经达到了目标。这些项目将在2010年全年继续进行,以确保实现生产力目标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号