首页> 外文会议>Sensors, Systems, and Next-Generation Satellites VIII >Microwave payloads development for ESA's future Earth Explorer missions
【24h】

Microwave payloads development for ESA's future Earth Explorer missions

机译:用于ESA未来Earth Explorer任务的微波有效载荷开发

获取原文
获取原文并翻译 | 示例

摘要

Six candidate Earth Explorer (satellite) missions were undergoing phase A industrial studies and science consolidation from 2002 to early 2004. They included 3'Core' missions (EarthCARE, SPECTRA and WALES) and 3 'Opportunity' missions (ACE+, EGPM, SWARM). Three of the candidate missions carry microwave payloads for atmospheric sensing. In April 2004, a selection workshop was held, and recommendations for implementation (phases B, C, D) were made by the Earth Sciences Advisory Committee (ESAC) and an implementation decision was taken by the Programme Board on Earth Observation (PB-EO) in May. SWARM, a magnetometry mission, was selected for full implementation as a 5th Explorer mission. The decision for the 6th Explorer mission was postponed to Nov. 2004 between EarthCARE and SPECTRA candidates, pending on the confirmation by JAXA on its contribution to EarthCARE and a re-examination by ESA. EGPM was recommended for implementation under the GMES, a new ESA programme of operational missions. In this paper, EarthCARE and EGPM are described with a particular emphasis on the microwave payloads.
机译:从2002年到2004年初,有6个候选的Earth Explorer(卫星)任务正在进行A期工业研究和科学合并。其中包括3个“核心”任务(EarthCARE,SPECTRA和WALES)和3个“机会”任务(ACE +,EGPM,SWARM) 。其中三个候选任务携带微波有效载荷进行大气传感。 2004年4月,举行了一次选拔讲习班,地球科学咨询委员会(ESAC)提出了实施建议(B,C,D期),地球观测计划委员会(PB-EO)做出了实施决定) 在五月。 SWARM(磁力计任务)被选为第5个“探索者”任务的完整实施对象。 EarthCARE和SPECTRA候选人之间的第6次探险者飞行任务的决定被推迟到2004年11月,有待JAXA确认其对EarthCARE的贡献以及ESA的重新审查。建议将EGPM实施在GMES(一项新的欧空局业务任务计划)下实施。在本文中,对EarthCARE和EGPM进行了描述,并特别强调了微波有效载荷。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号