Gitaru Unit No. 1-80 MW in three years

机译:Gitaru三年内的1-80 MW机组

获取原文
获取原文并翻译 | 示例

摘要

In October 1996 Mott MacDonald wih Knight Piesold were appointed by the Kenya Electricity Generating company Ltd (KenGen) to engineer the installation of the third and final unit (Unit 1) within the Gitaru power station situated on the Tana River approximately 160 km north east of Nairobi. The first two units at Gitaru were commissioned in 1978 and at that time it was expected that the third machine would follow after two or three years. However, it was not until 1996 that KenGen decided to proceed with implementation as it was decided that this machine was the most cost-effective means of quickly overcoming a lack of generating capacity.
机译:1996年10月,肯尼亚发电公司(KenGen)任命Mott MacDonald wih Knight Piesold负责在塔纳河东北约160公里的Gitaru电站内安装第三台也是最后一台机组(1号机组)。内罗毕。 Gitaru的前两个装置于1978年投入使用,当时预计第二台或第二台机器将在两三年后使用。然而,直到1996年KenGen才决定继续实施,因为这台机器被认为是快速克服发电量不足的最经济有效的手段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号