【24h】

OPERATIONAL STATUS OF THE POHANG LIGHT SOURCE

机译:彭亨光源的运行状态

获取原文
获取原文并翻译 | 示例

摘要

From the year 2000, the PLS storage ring stores 2.5GeV high-energy electron beam by ramping the energy from the 2.0GeV injection energy. The maximum stored current is presently 200mA at 2.5GeV, which is limited by the available RF energy. In May 2000, we succeeded in storing 300mA at 2.0GeV achieving the last design goal of the PLS. Further, the new record of the maximum stored beam current of 450mA at 2.0GeV was made in April 2001. Scheduled beam time to users in the PLS was 4,224 hours in 2000. The actual beam time available to users was 3,834 hours with a beam availability of 90.9%. The beam availability during operation in the first half of 2001 was improved to 93.6% that was the result of various improvements discussed here. At present, the PLS has 14 beamlines in operation and 9 beamlines under construction. A total of 237 experiments was carried out by 883 users in 2000.
机译:从2000年开始,PLS储能环通过使2.0GeV注入能量中的能量倾斜来存储2.5GeV高能电子束。目前最大存储电流为2.5GeV时为200mA,这受可用RF能量的限制。在2000年5月,我们成功存储了2.0mAV的300mA电流,实现了PLS的最后设计目标。此外,2001年4月创下了在2.0GeV时最大存储束流450mA的新记录。2000年PLS中用户预定的束流时间为4,224小时。束流可用时,用户可用的实际束流时间为3,834小时占90.9%。由于此处讨论的各种改进,2001年上半年操作期间的光束可用性提高到93.6%。目前,PLS有14条正在运行的光束线和9条正在建设中的光束线。 2000年,有883位用户进行了237次实验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号