首页> 外文会议>The role of irrigation and drainage in a sustainable future >HOLISTIC PERSPECTIVE FOR INVESTMENTS IN AGRICULTURAL DRAINAGE IN EGYPT
【24h】

HOLISTIC PERSPECTIVE FOR INVESTMENTS IN AGRICULTURAL DRAINAGE IN EGYPT

机译:埃及农业排水投资的整体视角

获取原文
获取原文并翻译 | 示例

摘要

During the last 30-40 years, Egypt has implemented one of the largest drainage networks in thernworld, consisting of surface drains, subsurface drains, pump stations and other related works.rnThe target area to be provided with subsurface drainage in Egypt is 6.4 million acres out ofrnwhich about 5.5 million acres is already implemented. Subsurface drainage systems in Egyptrnhave reached the stage that more areas installed have, in theory, passed their economic lifetimernand these areas need rehabilitation.rnThe overall cost of installation of subsurface drainage in Egypt is estimated at EGP 1600 per acrern(year 2007), and about EGP 900 per acre for rehabilitation of old drainage systems.rnMaintenance costs are estimated at EGP 50 per acre per year. The pay back period of drainage isrnnot more than 3-4 years. Incremental benefits of improved drainage on productivity amount tornUS $ 250 – 350, per hectare depending on location and soils.rnRecently, a new role for drainage as a complementary part of the integrated water resourcesrnmanagement has been recognized and the benefits of drainage went beyond reducing soil salinityrnand increasing crop yields. For that reason a new view for the drainage investment is neededrnwhich take into consideration all the benefits and impacts and the expected changes in all levelsrnof planning, implementing, operating, maintaining and managing the new and old drainagernsystems.rnThe objective of this paper is to identify the current and future investments of agriculturerndrainage for a sustainable agricultural production in Egypt. In spite of the great achievementsrnand benefits of drainage in Egypt, there is a huge potential for investments are needed to sustainrnagricultural drainage against the future challenges.
机译:在过去的30至40年中,埃及实施了Thernworld上最大的排水网络之一,包括地表排水,地下排水,泵站和其他相关工程。埃及要提供地下排水的目标面积为640万英亩其中已实施约550万英亩。从理论上讲,埃及的地下排水系统已经达到了已安装的更多区域的阶段,从理论上讲,它们的经济寿命已过,这些区域需要修复。rn埃及地下排水系统的总安装成本估计为每英亩1600 EGP(2007年),大约旧排水系统的修复费用为每英亩900埃及镑。rn维护成本估计为每年每英亩50埃及镑。排水回收期不超过3-4年。根据位置和土壤的不同,改善排水对生产力的增量收益约为250-350美元/公顷。盐度提高作物产量。因此,需要对排水投资有一个新的认识,即要考虑到所有利益和影响以及各个层次的预期变化。新,旧排水系统的规划,实施,运行,维护和管理。本文的目的是确定农业排水的当前和未来投资,以实现埃及的可持续农业生产。尽管在排水方面取得了巨大成就和好处,但仍需要巨大的投资潜力来维持农业排水以应对未来的挑战。

著录项

  • 来源
  • 会议地点 Sacramento CA(US)
  • 作者

    M.A.S. Wahba; M.H. Amer;

  • 作者单位

    Drainage Research Institute (DRI), NWRC,Egypt. Tel: 002024464505- 002024464626, Fax:002024464504 mswahba@hotmail.com encid@link.com.eg;

    rnNational Water Research Center (NWRC), Cairo, Egypt and Chairman of ENCID email: encid@link.com.eg;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 TV212.54;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号