Hyrum Dam's Seismic Issue Evaluation

机译:Hyrum大坝的地震问题评估

获取原文
获取原文并翻译 | 示例

摘要

In 2009, a possible dam deficiency was identified. Hyrum dam was built over a relatively thin unconsolidated alluvial deposit that could be at risk for strength loss during a large earthquake. If large deformations were to occur because of the strength loss, the crest height might be reduced or cracking of the embankment may occur, and could potentially lead to failure. In order to assess the situation, a field investigation was completed to measure the in situ properties of the dam embankment and the alluvium; and a seismic hazard analysis was performed. A comprehensive analysis was then undertaken to estimate potential deformation and overtopping. Using the data from updated seismic loading, field investigation, and analysis, a risk analysis was performed for potential failure modes. The annualized failure probability was estimated, using an event tree approach. The risk analysis revealed that the likelihood of dam failure during a seismic event was below the Bureau of Reclamation's (reclamation) standards.
机译:2009年,确定了可能的水坝不足。 Hyrum大坝建在相对较薄的未固结冲积物上,可能会在大地震中丧失强度。如果由于强度损失而发生大的变形,则波峰高度可能会降低或路堤开裂,并有可能导致破坏。为了评估情况,完成了实地调查,以测量大坝堤防和冲积层的原位特性。并进行了地震危险性分析。然后进行了全面的分析,以估计潜在的变形和超车。使用来自更新的地震荷载,现场调查和分析的数据,对潜在的破坏模式进行了风险分析。使用事件树方法估计了年度失效概率。风险分析表明,地震事件中大坝发生故障的可能性低于填海局(填海)标准。

著录项

  • 来源
    《Rocky mountain geo-conference 2016》|2016年|166-189|共24页
  • 会议地点 Golden(US)
  • 作者

    Greg Eddy;

  • 作者单位

    Bureau of Reclamation, P.O. Box 25007, Denver, CO 80225;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号