首页> 外文会议>Reliability and optimization of structural systems >Stochastic life-cycle cost analysis of structures in a finite time planning horizon
【24h】

Stochastic life-cycle cost analysis of structures in a finite time planning horizon

机译:有限时间计划范围内结构的随机生命周期成本分析

获取原文
获取原文并翻译 | 示例

摘要

The paper presents a stochastic model of structural degradation and maintenance cost optimization over the life cycle of a structure. The maintenance optimization models reported in the literature mostly minimize the asymptotic expected cost rate computed using the classical renewal theorem. Since practical engineering projects have relatively short and finite operating life and financing time horizon, the application of asymptotic formulation in such cases becomes questionable. This paper presents a new finite time model for computing the expected life cycle cost with and without discounting, and highlights its advantages through a practical case study.
机译:本文提出了结构退化和维护成本在结构生命周期内的随机模型。文献中报道的维护优化模型大多将使用经典更新定理计算的渐近预期成本率最小化。由于实际的工程项目具有相对较短且有限的使用寿命和融资时间范围,因此在这种情况下渐近公式的应用变得令人怀疑。本文提出了一种新的有限时间模型,用于计算带折扣和不带折扣的预期生命周期成本,并通过实际案例研究突出了其优势。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号