首页> 外文会议>Recent researches in communications and IT >ETHERNET POWERLINK ASYNCHRONOUS PHASE EXAMINATION
【24h】

ETHERNET POWERLINK ASYNCHRONOUS PHASE EXAMINATION

机译:以太网POWERLINK异步相位检查

获取原文
获取原文并翻译 | 示例

摘要

This paper, as continuation of author's previous paper, describes Ethernet Powerlink communication protocol performance evaluation. After the slight introduction to Industrial Ethernet and Ethernet Powerlink (EPL) specifically, the simulation process is described. In the following, the paper is focused on the asynchronous communication phase. The EPL cycle asynchronous phase behavior is simulated and there are shown two typical situations that can arise. In case that such a simulation is made during network design, it can reveal incorrect behavior of the network in early project phase. Economical aspects of such solution are the main contribution of such process.
机译:本文是作者先前论文的延续,描述了以太网Powerlink通信协议性能评估。在简要介绍了工业以太网和以太网Powerlink(EPL)之后,描述了仿真过程。在下文中,本文着重于异步通信阶段。对EPL周期异步相位行为进行了仿真,并显示了可能出现的两种典型情况。如果在网络设计期间进行了这样的仿真,则它可以揭示项目早期的网络错误行为。这种解决方案的经济方面是这种过程的主要贡献。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号