首页> 外文会议>Pushing Technology Boundaries: Rejuvenating Fields and Skills >The 200th Horizontal Openhole Gravel-Packing Operation in Campos Basin: A Milestone in the History of Petrobras Completion Practices in Ultradeep Waters
【24h】

The 200th Horizontal Openhole Gravel-Packing Operation in Campos Basin: A Milestone in the History of Petrobras Completion Practices in Ultradeep Waters

机译:坎波斯盆地第200次水平裸眼砾石充填作业:超深水区巴西石油公司完井实践的里程碑

获取原文
获取原文并翻译 | 示例

摘要

The paper presents an overview of the evolution of Petrobras open hole gravel packing operational practices after the 200th well has been successfully completed with this technique in Campos Basin (CB): a milestone in the history of Petrobras completion practices in deep and ultra-deepwaters.The paper also presents a comprehensive description of the main steps taken to improve our horizontal open-hole gravel packing (HOHGP) practices towards a best-in-class status in unconsolidated oil-bearing turbidites. Since the first HOHGP job done in 1988 we had to move progressively from shallow to ultra-deepwater completion scenarios. Along this path a series of innovations has been incorporated to our sand face completion practices due to the ever-growing-complexity of the wells geometry, longer intervals to be completed, heavier oil reserves to be developed, rock mechanics restraints (ever-lowering fracture gradients) and the necessity of damage-free-, high-performance-wells to cope with the skyrocketing capital expenditures which is a general rule for offshore ultra-deepwaters nowadays.Petrobras strategy conceived to continuously enhance its HOHGP completion efficiency index encompasses, the following interrelated subjects: -a comprehensive long-term plan to deal with the problem, -a multi-disciplinary team-work approach, -a strong cooperation with gravel packing tools & screens suppliers, -improvement of operational procedures and guidelines against which to measure well performance and -research & investment in cutting-edge technologies.Discussions on the challenges envisioned for HOHGP operations in ultra-deepwaters in the years to come are also presented.
机译:本文概述了在坎波斯盆地(CB)完井的第200口井已成功完成Petrobras裸眼砾石充填作业实践的演变:这是Petrobras在深水和超深水完井实践史上的里程碑。本文还全面介绍了为改善我们的水平裸眼砾石充填(HOHGP)实践以在未固结含油浊度方面达到最佳状态而采取的主要步骤。自1988年完成第一项HOHGP工作以来,我们不得不逐步从浅水到超深水完井方案。由于油井几何形状的日益复杂,需要完成的间隔更长,需要开发的油藏更大,岩石力学受到限制(裂缝不断降低),因此沿着这条道路,我们在砂面完井实践中进行了一系列创新。梯度)和无损高性能井的必要性以应对不断增长的资本支出,这是当今海上超深水的普遍规则.Petrobras策略旨在不断提高其HOHGP完井效率指数,包括以下内容相互关联的主题:-解决问题的全面的长期计划,-多学科的团队合作方法,-与砾石充填工具和筛网供应商的强有力合作,-改进操作程序和指南以更好地衡量性能和尖端技术的研究与投资。讨论超高深度HOHGP操作所面临的挑战还介绍了未来几年的水域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号