Large Cranes Optimization In Construction of Offshore Structures

机译:海上起重机施工中大型起重机的优化

获取原文
获取原文并翻译 | 示例

摘要

This paper proposes optimization methods for the large cranes in thernconstruction process of functional modules, jackets and steel piles.rnFunctional modules are partially constructed in the way of jacking uprninstead of the traditional lifting way by cranes, and jackets are installedrnby the way of roll-up that substitutes for traditional lifting way, whilernthe load-out method for steel piles at yard is changed from lifting byrnfloating crane to rolling on by crawler crane and winch. Thus, thernoptimization methods largely reduce the quantities of large cranes thatrnare used in the construction, and decrease the costs and schedules ofrnconstruction process.
机译:本文提出了大型起重机在功能模块,外套和钢桩施工过程中的优化方法。功能模块是通过顶升的方式部分构造的,而不是传统的起重机吊装方式,而是通过卷扬的方式安装外套。代替了传统的起重方式,而将院子里的钢桩的卸载方法从由浮吊起重改为履带吊和绞车滚动。因此,最优化方法大大减少了施工中使用的大型起重机的数量,并降低了施工过程的成本和进度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号