首页> 外文会议>The proceedings of the Eleventh (2014) Pacific/Asia offshore mechanics symposium >Influence of the Three Gorges Dam on Sediment Budget at Mouth Bar of the Yangtze Estuary
【24h】

Influence of the Three Gorges Dam on Sediment Budget at Mouth Bar of the Yangtze Estuary

机译:三峡大坝对长江口口坝泥沙淤积的影响

获取原文
获取原文并翻译 | 示例

摘要

The influence of the TGD (Three Gorges Dam) constructed upstream onrnthe sediment transport in the Yangtze Estuary has been investigated inrnthis paper. The process-based model is used to simulate the sedimentrntransport in the Yangtze Estuary before and after the TGD constructed.rnThe result shows that the influence of TGD on the sediment budget inrnthe mouth bar area of the estuary is significant. The seasonal feature ofrnsediment transport around the mouth bar area remains the same after thernTGD constructed as that before, i.e. erosion in dry season andrndeposition in wet season with sedimentation in total over a year.rnHowever, the magnitude of total amount sediment trapped in the mouthrnbar area decrease tremendously after the TGD constructed, as accountrnof 25% of that before.
机译:本文研究了上游兴建的三峡大坝(TGD)对长江口泥沙输移的影响。利用基于过程的模型模拟了三峡工程建设前后长江口河口输沙量的变化。结果表明,三峡工程对河口口坝区泥沙收支的影响很大。 TGD建成后,口岸周围泥沙运移的季节特征与以前相同,即干季侵蚀,湿季沉积,一年以上的沉积。rn但是,口岸地区截留的沉积物总量TGD建成后,下降幅度很大,约为之前的25%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号