【24h】

ECOS:Thermodynamic and economic analysis of Gas Turbine Air Bottoming Cycle as a high efficient Peaking Power Plant

机译:ECOS:作为高效调峰动力装置的燃气轮机空底循环的热力学和经济分析

获取原文
获取原文并翻译 | 示例

摘要

An significant increase in the efficiency of energy systems can be achieved by the development of combined cycles.Examples of high efficiency cycles are Combined Cycle Power Plant(CCPP)and Gas Turbine Air Bottoming Cycle(GT-ABC),which is a combination of a gas turbine and air turbine cycle coupled by means of a heat exchanger referred to as the Air Heat Exchanger(AHX).The main feature of the GT-ABC is a low water consumption and fast start-up.The mechanical power obtained from the turbine can be used either to support the gas turbine system or to power generation.The GT-ABC operation as a peaking power plant is very interesting in terms of power generation.Due to the short start-up time of the air turbine,the ability to meet the peak demand for power may be significant.The paper presents selected technological structures of the GT-ABC system.A method of increasing the efficiency and mechanical power output of existing gas turbines is shown.Base-and peak load operations of the GT-ABC system are analyzed.Investment expenditures on main equipment are estimated.An economic analysis of the GT-ABC base-and peak load operations is performed.
机译:联合循环的发展可以显着提高能源系统的效率。高效循环的例子有联合循环发电厂(CCPP)和燃气轮机空气底部循环(GT-ABC),这是一个联合循环系统。燃气轮机和空气涡轮机通过一个称为空气热交换器(AHX)的热交换器进行循环.GT-ABC的主要特点是耗水少,启动迅速。既可以用于支持燃气轮机系统,也可以用于发电。GT-ABC作为峰值发电厂在发电方面非常有趣。由于风力涡轮机的启动时间短,满足峰值功率需求可能是重要的。本文介绍了GT-ABC系统的选定技术结构。显示了一种提高现有燃气轮机效率和机械功率输出的方法。GT-ABC的基本负荷和峰值负荷运行美国广播公司对主干进行分析,估算主要设备的投资支出,并对GT-ABC基本负荷和峰值负荷进行了经济分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号