首页> 外文会议>Proceedings of the 42nd Annual Conference on Deep Foundations >BAUM STATION – A NEW PILE DRIVING AND DRILLING NAVIGATION SYSTEM
【24h】

BAUM STATION – A NEW PILE DRIVING AND DRILLING NAVIGATION SYSTEM

机译:鲍姆站–一种新的桩驱动和钻井导航系统

获取原文
获取原文并翻译 | 示例

摘要

A new pile driving and drilling navigation system has been developed. It utilizes the commonly usedrnsurveying total station, combined with an innovative reticle. Conventional crosshairs have been replaced byrna concentrically circular reticle called Baum. It allows for easily performed measurements of central axesrnof cylindrical objects such as piles, chimneys, electricity poles, etc. This provides several significantrnadvantages compared to other existing systems. It is cost-effective as only one operator is required to controlrndeviations in positioning and inclination. Furthermore, repetitive reinstallation of the instrument is notrnrequired for every pile driven or hole drilled. It is also a safer method, as workers have no need to be near arnpile driver or drilling machine to perform the measurements. With Baum Station, necessary measurementsrncan be performed away from the actual work area. Moreover, it is highly accurate with real-time solutions,rnas three-dimensional orientation information for the pile/drill is obtained simultaneously with the pile beingrndriven or the hole being drilled. This allows for the highest levels of precision-control and correction tornminimize eccentricity of the intended center positioning.
机译:已经开发了一种新的打桩和钻井导航系统。它利用了常用的测量全站仪,并结合了创新的标线。传统的十字准线已被称为Baum的同心圆十字线代替。它允许轻松地测量圆柱,圆柱体等中心轴,例如桩,烟囱,电线杆等。与其他现有系统相比,这提供了许多重要的优点。由于只需要一名操作员来控制位置和倾斜度的偏差,因此具有成本效益。此外,不需要对每个打桩或钻孔的仪器进行重复性的重新安装。这也是一种更安全的方法,因为工人无需靠近收割机或钻孔机即可进行测量。使用Baum Station,可以在实际工作区域之外进行必要的测量。此外,它具有实时解决方案的高精度,可以在打桩或钻孔时同时获得桩/钻头的三维方位信息。这样可以实现最高级别的精确控制和校正,以最大程度地降低预期中心位置的偏心率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号