A 17 story building was constructed at the Brooklyn Navy Yard on a site with a long history of development.rnMost recently the site supported a dewatering well and craneway to service two adjacent drydocks. Thernsubsurface conditions generally consist of the following strata and approximate depths: miscellaneous fillrnand debris to 20 ft., organic soils to 35 ft., liquefiable sand to 45 ft., varved clay to 65 ft., glacial till to 95rnft. and gneiss bedrock.rnHollow core bar piles replaced 18 in. diameter caissons on a 1.67:1 basis. The resulting service loads onrnthe hollow bar piles were 600 kips compression, 21 kips lateral, 180 kips tension and 450 inch-kips moment.rnThe top 30 feet of the hollow bar was cased with a 16 in. x 0.375 in. Grade 50 steel pipe. The piles werernsocketed 6 feet into bedrock. An extensive load testing program confirmed the axial and lateral loadrncapacities. The paper will also discuss some adjustments to the installation procedure based on the load testrnprogram.
机译:布鲁克林海军船坞的一处历史悠久的建筑建造了一座17层高的建筑。最近,该建筑为一处排水井和一条吊车道提供了服务,可为两个相邻的干船坞提供服务。地下条件通常由以下地层和大约深度组成:杂碎屑和碎屑至20英尺,有机土壤至35英尺,可液化砂土至45英尺,裂谷粘土至65英尺,冰川至95英尺。空心岩心桩在1.67:1的基础上替换了18英寸直径的沉箱。在空心棒桩上产生的服务载荷为600 kips压缩,侧向21 kips,180 kips张力和450英寸kips力矩。rn空心棒顶部30英尺的套管用16英寸x 0.375英寸的50级钢管制成。将这些桩装进6英尺深的基岩中。广泛的载荷测试程序确认了轴向和横向载荷能力。本文还将讨论基于负载测试程序的安装过程的一些调整。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号