【24h】

Stability-based Risk Analysis for the Construction Phases of Long-Span CFST Arch Bridge

机译:大跨度钢管混凝土拱桥施工阶段基于稳定性的风险分析

获取原文
获取原文并翻译 | 示例

摘要

Many researches have been done to evaluate the safety of constructed bridges and the uncertainties in the construction phases have been ignored. This paper adopts the 3D finite element program ANSYS to establish the space model of CFST Arch Bridge, and to calculate the linear, the geometrical nonlinear and the double nonlinear buckling safety factors under the six different lode cases. Then the bridge's risks are evaluated according to the results calculated which provide a reference for design of similar project.
机译:已经进行了许多研究来评估桥梁的安全性,并且忽略了施工阶段的不确定性。本文采用3D有限元程序ANSYS建立CFST拱桥的空间模型,计算六种不同情况下的线性,几何非线性和双非线性屈曲安全系数。然后根据计算结果评估桥梁的风险,为类似工程的设计提供参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号