首页> 外文会议>Proceedings of the 1st Australasian coal operators conference (Coal 1998) >Experience with Stress Control Methods as a Planning Tool - Elouera Colliery
【24h】

Experience with Stress Control Methods as a Planning Tool - Elouera Colliery

机译:压力控制方法作为计划工具的经验-Elouera煤矿

获取原文
获取原文并翻译 | 示例

摘要

Continued extraction of the No.3 Seam at Elouera Colliery required the driveage of a sequence of roadways within an arearnof significantly elevated horizontal stress. Initial roof conditions varied from excellent to very severe as the panel enteredrnthe high stress area. The variation was attributed to the extraction sequence, with different roadways "leading" the panelrninto the high horizontal stressfield.rnThis paper summarises field and analytical work designed to evaluate the use of stress control methods as an effectivernplanning tool. The "leading" roadway of the panel would be required to remain stable whilst experiencing moderate tornsevere deformation whilst the neighbouring roadways (stress relieved) could be driven at more acceptable advance ratesrnusing less reinforcement.rnThe planning implications of developing the panel with stress control methods are discussed.
机译:继续开采Elouera煤矿的3号煤层需要在水平应力明显增大的区域内驱动一系列的巷道。当面板进入高应力区域时,初始屋顶条件从极好到极差。变化归因于提取顺序,不同的巷道将面板“引导”到高水平应力场中。本文总结了旨在评估应力控制方法作为有效规划工具使用情况的场和分析工作。要求面板的“前导”巷道保持稳定,同时经历中等程度的剧烈变形,而相邻的巷道(缓解应力)可以以可接受的更高的前进速度来驱动,而无需使用钢筋。rn使用应力控制方法开发面板的计划意义是讨论过。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号