SOUTH GATE COMPLEX PLANNING AND DESIGNPORT OF PALM BEACH, RIVIERA BEACH, FLORIDA

机译:佛罗里达里维埃拉海滩棕榈海滩的南门综合规划设计港

获取原文
获取原文并翻译 | 示例

摘要

The Port of Palm Beach is a 153 acre niche port located on the Southeast coast ofrnFlorida, approximately 60 miles North of Miami. Over the past decade, the Port ofrnPalm Beach has transformed to a modern Port able to meet the planned needs of itsrntenants and implement their 1995 Master Plan. Today, due to efficient land use, itrnhas one of the highest container throughputs per acre in the country. The Portrncontinues to grow in through-put at a rapid pace and it is imperative that they adaptrnthere current and restricted land to meet the expanding demands.rnIn 2005, the Port developed a 2005 – 2015 Master Plan that established nearly $150rnmillion dollars in Capital Improvements to expand the Port's operations by morernefficiently using the existing lands and proposing Southward expansion into newrnland. One project within the 2005 Master Plan is the creation of a South GaternFacility which includes: Demolition of an existing 160,000 SF office/retail building;rnConstruction of a 60,000 SF Warehouse and associated Security Offices;rnConstruction of Access Road Improvements; Construction of a New Multi-Lane GaternFacility; and, Construction of a 5.5 acres of cargo laydown area.rnThe South Gate project is budgeted at $16 million for planning, design, andrnconstruction. At completion, this project will open up/develop 2 acres of waterfrontrnby consolidating the warehouses spread throughout the Port as well as create nearly 6rnacres of additional cargo lay-down space for expanded Port business. This project isrnexpected to be the cornerstone project to start the remainder of the 2005 Master Planrnprojects including a future tie-in to planned future state highway improvements. It isrnexpected that the South Gate Facility will be accomplished while maintainingrnuninterrupted business operations.rnThrough tenant partnering, aggressive planning and decisions, this project isrnexpected to be completed at the end of 2007. This paper will outline the process ofrnplanning, security considerations and requirements, the functional layout of thernfacility and the construction phasing processes used in order to maintain businessrnflow during construction.
机译:棕榈滩港口是一个占地153英亩的利基港口,位于佛罗里达州东南部的佛罗里达南部,距迈阿密以北约60英里。在过去的十年中,棕榈海滩港口已转变为现代港口,能够满足其租户的计划需求并执行其1995年总体规划。如今,由于土地的有效利用,它成为该国每英亩集装箱吞吐量最高的国家之一。港口持续快速增长,必须适应现有和有限的土地以满足不断增长的需求。2005年,港口制定了2005年至2015年的总体规划,该规划建立了近1.5亿美元的资本改善项目通过更有效地利用现有土地并提议向南扩展到纽兰来扩展港口的业务。 2005年总体计划中的一个项目是建立南盖特设施,其中包括:拆除现有的160,000平方英尺的办公室/零售大楼; rn建设60,000平方英尺的SF仓库和相关的安全办公室; rn修建通行道路;建设新的多车道Gatern设施;南门项目预算为1600万美元,用于规划,设计和施工。该项目完成后,将合并分布在整个港口的仓库,开辟/开发2英亩的滨水区,并为扩展的港口业务创造近6英亩的额外货物放下空间。预计该项目将是启动2005年总体规划其余项目的基础项目,其中包括将来与计划中的未来州际公路改善相结合。预计南门设施将在维持不间断的业务运营的同时完成。通过租户合作,积极的计划和决策,该项目有望在2007年底完成。本文将概述规划过程,安全注意事项和要求,设施的功能布局以及用于在施工过程中维持业务流向的施工阶段过程。

著录项

  • 来源
  • 会议地点 San Diego CA(US)
  • 作者单位

    Gee Jenson, a Division of CH2M Hill, One HarvardrnCircle, West Palm Beach, FL 33409 Phone: 561.515.6629 email:rnjlong3@ch2m.com;

    rnEngineering and Maintenance, Port of Palm Beach District, One East 11thrnStreet, Riviera Beach, FL 33404 Phone: 561.383.4100 email:rntlundeen@portofpalmbeach.com;

    rnGee Jenson, a Division of CH2M Hill, One Harvard Circle,rnWest Palm Beach, FL 33409 Phone: 561.515.6628 email: dmock@ch2m.com;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 港口工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号