Lake Tawakoni Water Supply ProjectConstruction Management – Engineers as Resident Representatives

机译:塔瓦科尼湖供水项目建设管理–工程师担任驻地代表

获取原文
获取原文并翻译 | 示例

摘要

Since its formation in 1951, the North Texas Municipal Water District hasrnbeen charged with developing a reliable water supply source for its 13 member citiesrnand 57 other customers (some direct and some indirect), serving more than 1.6rnmillion people in portions of north Texas. The District’s service area covers portionsrnof Collin, Dallas, Denton, Fannin, Hunt, Kaufman, Rains, and Rockwall Counties.rnLong-range water supply planning efforts identified significant increases in waterrndemands that must be met through a corresponding increase in available raw waterrnsupply. Compounding the need for raw water is the fact that the north Texas regionrnexperienced serious drought conditions within the last few years with the District’srnprimary water supply reservoir, Lake Lavon, falling some 17 feet in water surfacernelevation from May 2005 to October 2006. Additional raw water supply was neededrnto prevent extensive water restrictions during this drought and provide for continuedrngrowth of the service area.rnIn an effort to supplement available supplies, the District contracted forrn50,000 acre-feet of water per year from the Sabine River Authority in LakernTawakoni, located approximately 45 miles east of Dallas in October 2005. Therninfrastructure needed to transfer this water from Lake Tawakoni was designed andrnconstructed within an accelerated schedule from January 2006 to July 2008. Therninfrastructure includes approximately 30 miles of 54 and 60-inch-diameterrntransmission pipeline and two pump stations, each with a raw water pumpingrncapacity of 75 MGD at a total project cost of nearly $100 million.rnConstruction management and coordination of the multiple projectrncomponents was critical. The focus of this paper will be a discussion of the majorrnproject components, construction management, and lessons learned duringrnconstruction of the multi-million dollar project on an accelerated schedule. Uniquernproject issues included coordination of 5 construction contracts, equipment preselectionrnand delivery, implementing pipeline corrosion control, technology basedrnmanagement and paperless submittal process, conflict resolution, and specific itemsrnof interest related to engineers as resident representatives. Some of the constructionrnissues to be discussed include addressing failures of pipeline joint bonds andrnconstruction of a 14-foot diameter shaft on the shore of Lake Tawakoni.
机译:自1951年成立以来,北得克萨斯州市政供水区一直负责为其13个成员城市和57个其他客户(部分直接或部分间接)开发可靠的供水源,为德克萨斯州北部的部分地区的16亿人提供服务。该地区的服务区涵盖了科林,达拉斯,丹顿,范宁,亨特,考夫曼,雷恩斯和罗克沃尔县等地区。对原水的需求增加了一个事实,即德克萨斯州北部地区在过去几年中经历了严重的干旱状况,该地区的主要供水水库Lavon湖从2005年5月到2006年10月的水面高度下降了约17英尺。为了防止干旱期间广泛的水限制和服务区的持续增长,需要供水。为了补充可用的水源,该区每年从位于萨尔瓦纳河管理局位于萨瓦讷河的塔瓦科尼湖签订了50,000英亩英尺的水合同。 2005年10月,从达拉斯向东约45英里。从塔瓦科尼湖转移水所需的基础设施是在2006年1月至2008年7月的加速时间内设计和建造的。该基础设施包括约30英里的54和60英寸直径的输水管道和两台泵每个站的原水泵容量为75 MGD项目总成本将近1亿美元。对多个项目组成部分的施工管理和协调至关重要。本文的重点将是讨论重大项目的组成部分,施工管理以及在数百万美元项目的建设中以加速进度的经验教训。项目的独特问题包括协调5个施工合同,设备预选和交付,实施管道腐蚀控制,基于技术的管理和无纸化提交流程,冲突解决以及与工程师作为常驻代表有关的特定项目。要讨论的一些施工问题包括解决管道接头粘结的故障和在塔瓦科尼湖岸边建造直径14英尺的竖井的问题。

著录项

  • 来源
  • 会议地点 San Diego CA(US);San Diego CA(US)
  • 作者

    David Bennett; Sam Meisner;

  • 作者单位

    Freese and Nichols, Inc., 1701 N. Market Street, Suite 500, LB 51, Dallas, Texasrn75202 PH (214) 217-2200 FAX (214) 217-2201 email: 1dtb@freese.com;

    rnFreese and Nichols, Inc., 1701 N. Market Street, Suite 500, LB 51, Dallas, Texasrn75202 PH (214) 217-2200 FAX (214) 217-2201 email: 2sam@freese.com;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 管道运输;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号