首页> 外文会议>Offshore technology conference >Installation of Deepwater Pipelines With Sled Assemblies Using The New J-Lay System of the DCV Balder
【24h】

Installation of Deepwater Pipelines With Sled Assemblies Using The New J-Lay System of the DCV Balder

机译:使用DCV压捆机的新型J层系统安装带有滑道组件的深水管道

获取原文
获取原文并翻译 | 示例

摘要

This paper describes the most important features required forrninstalling deepwater pipelines, pipelines with in-line sledrnassemblies, PLETs, and SCRs. This includes methodologiesrnspecifically developed to suit the capabilities of DCV Balder.rnDuring the last quarter of 2002, Heerema Marine Contractorsrn(HMC) performed an extensive Trials program proving allrnpipelay methodologies and associated installation proceduresrnof the DCV Balder. This included the installation of 10 kmrn28-inch and 24-inch pipe with a Pipeline End Terminationrn(PLET) and an in-line sled assembly.rnSubsequent to successful completion of these trials, the DCVrnBalder started with installation projects which included therninstallation of in-line sled assemblies with weights up to 136rnmT.
机译:本文介绍了安装深水管道,带有串联滑架组件的管道,PLET和SCR所需的最重要的功能。这包括专门为适应DCV Balder的功能而开发的方法。在2002年最后一个季度,Heerema Marine Contractors(HMC)进行了广泛的试验计划,证明了DCV Balder的所有管道铺设方法和相关的安装程序。其中包括安装10 kmrn,28英寸和24英寸的管道以及管道末端终端(PLET)和串联滑橇组件。rn在成功完成这些试验之后,DCVrnBalder开始进行安装项目,其中包括安装重达136rnmT的生产线滑橇组件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号