Pazflor - The Challenges of the Offshore Phase

机译:Pazflor-近海阶段的挑战

获取原文
获取原文并翻译 | 示例

摘要

HSErnThe Pazflor SURF installation campaigns kicked-off on O5th September 2010 with the mobilisation of the first construction vessel and ended in September 2011. With over 800 people present offshore at peak of activity and 1.5 million manhours upon completion, it has unfolded without any major incident.rnDuring the preparation phase, particular attention was paid to the bridging of the HSE management system of the 3 main contractors with the system of Total, and especially the emergency response procedures.rnDuring the execution phase, the project installation team focused on the anticipation of co-activities between construction vessels, other vessels such as drilling rigs and surface or subsea assets and was successful in eliminating most of these situations, or properly preparing the one that couldn't be avoided.rnCampaign size and integrated schedulernPazflor subsea installation campaigns involved the installation of 180 km of pipelines, 84 km of umbilicals, 17 risers (including 2 IPBs) and 7 dynamic umbilicals as well as over 120 subsea structures totalling about 10,000 tonnes. Over 350 ROV tools and accessories were necessary to perform more than 200 subsea tie-ins.rnThe campaign has involved up to 6 main construction vessels at peak of activity (the complete construction spread reaching nearly 40 vessels and barges) working in conjunction with 3 drilling rigs and seismic acquisition spreads.rnPotential interferences between the construction spread and other vessels were anticipated using an integrated location-based planning and were all but completely avoided in spite of a very intense period of activity in the first semester of 2011.rnCampaign complexityrnBoth Pazflor Oligocene and Miocene production systems consist in complex assemblies of components with very different design principles and installation constraints (flexible risers, rigid lines, flextails, subsea connectors, rigid spools, subsea structures...), which require specific installation means and dictate the installation and test sequence. As a consequence, the plannings of all the main construction vessels are heavily inter-dependant.rnSuch interdependence raised the stakes of respecting vessels' respective schedules a step higher than is usual in offshore operations. Preparation and prior full scale testing allowed to ensure no unexpected event affected the good development of the more complex installation phases.
机译:HSErnPazflor SURF安装活动于2010年9月5日开始,动员了第一艘建筑船,并于2011年9月结束。活动高峰期有800多人在岸,完成后有150万工时,无任何重大事故在准备阶段,尤其要注意将3个主要承包商的HSE管理系统与道达尔(Total)系统进行桥接,特别是在应急响应程序之间.rn在执行阶段,项目安装团队将重点放在建造船,其他船(例如钻机)和地面或海底资产之间的共同活动,成功地消除了大多数此类情况,或正确地准备了无法避免的情况。安装180公里的管道,84公里的脐带,17个立管(包括2个IPB)和7个动态脐带缆以及120多个海底结构,总计约10,000吨。要进行200多次海底捆绑作业,需要350多种ROV工具和配件。rn该活动涉及多达6艘处于活动高峰期的主要建筑船只(整个建筑范围覆盖了近40艘船舶和驳船),并进行了3次钻探rn通过使用基于位置的综合规划,可以预测建筑扩展与其他船只之间的潜在干扰,尽管活动在2011年上半年非常紧张,但几乎完全避免了.rn战役复杂性rn Pazflor渐新世都中新世生产系统由复杂的组件组装组成,这些组件具有非常不同的设计原理和安装限制(柔性立管,刚性管线,挠性接头,海底连接器,刚性线轴,海底结构...),这需要特定的安装方式并决定安装和测试顺序。结果,所有主要建造船的计划都是高度相互依存的。这种相互依存关系使遵守船舶各自的船期表的风险比在海上作业中通常要高得多。准备工作和事先进行的全面测试可以确保没有意外事件影响更复杂的安装阶段的良好发展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号