This paper provides an overview of the Who Dat development. The Who Dat field is located in the Mississippi Canyon protraction area of the Gulf of Mexico in blocks 503, 504 and 547 and is being developed using the OPTI-EX semisubmersible floating production system (FPS) which has a capacity of 60 MBOPD and 150 MMCFD. The Who Dat discovery is primarily oil and consists of ten stacked amplitude-supported reservoirs in a salt withdrawal mini-basin. Three wells have been drilled to date penetrating over 700' of net pay in nine distinct reservoirs ranging in depth from 12,000' to 17,000' TVD. The field will be developed with twelve subsea wells (i.e. wet trees) flowing to three subsea manifolds and subsequently to the FPS via two infield flowloops using flexible risers. The project includes a 10" gas export line and 14" oil export line also using flexible risers.rnThe paper covers the exploration phase including evaluating the prospect prior to the lease sale and adjusting the delineation plan based on the discovery well. The paper also covers the development concept selection including the evolution of the project from a long subsea tieback to a new FPS, the challenges of utilizing an FPS that was built on a speculative basis (modifications required, regulatory approval), and contracting strategy (negotiation of an installment purchase and managing uncertainty in a post-Macondo environment).rnThis development represents a number of firsts: first time that a private company will own an FPS, first time the OPTI-EX semisubmersible FPS will be used, first time an FPS has been approved for installation post-Macondo, first time an FPS has been built on speculation, and first time a field has gone from concept selection to installation of a new FPS in less than a year. The project's accelerated schedule created challenges since numerous items were on critical path, including items that are typically nowhere near critical path.
机译:本文提供了Who Dat开发的概述。 Who Dat油田位于墨西哥湾的密西西比峡谷延伸区的503、504和547区块,正在使用OPTI-EX半潜式浮动生产系统(FPS)开发,该系统的生产能力为60 MBOPD和150 MMCFD 。 Who Dat的发现主要是石油,并且在取盐小盆地中由十个堆积的振幅支持储层组成。迄今为止,已经在9个不同的储层中钻了3口井,钻探净收入超过700英尺,深度从12,000'到17,000'TVD。油田将被开发,其中有十二口海底井(即湿木)流向三个海底歧管,然后通过两个使用挠性立管的内流环流流入FPS。该项目包括一条10英寸的天然气出口管线和一条14英寸的石油出口管线,这些管线也使用了柔性立管。rn本文涵盖了勘探阶段,包括在租赁销售之前评估勘探前景,并根据发现井调整划定计划。本文还涵盖了开发概念的选择,包括项目从长期的海底绑扎到新的FPS的演进,使用基于投机的FPS的挑战(需要修改,监管批准)以及签约策略(谈判)。在Macondo后的环境中分期付款购买和管理不确定性).rn此发展代表了许多首创:首次私人公司拥有FPS,首次使用OPTI-EX半潜水FPS,首次FPS已在Macondo之后获得安装许可,这是首次基于推测构建FPS,并且在不到一年的时间内,该领域首次从概念选择到安装新的FPS。由于大量项目都在关键路径上,包括通常远没有达到关键路径的项目,因此该项目的进度加快带来了挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号