This paper presents the design and implementation of buoyedrnsteel catenary risers (SCR). Two 6" steel catenary risers,rninstalled in November-December 2001, were designed torninclude 50,000-pounds of buoyancy per riser in 3,300 feet ofrnwater for Mariner Energy, Inc.'s King Kong/Yosemite fieldrndevelopment in the Green Canyon area of the Gulf of Mexico.rnThe risers are suspended from the Agip Petroleumrn"Allegheny" tension leg platform (TLP) where reduced riserrnloads were required for additional process equipment and safernTLP operation.
机译:本文介绍了浮标钢悬链提升管(SCR)的设计和实现。 2001年11月至12月安装的两个6英寸钢悬链立管设计用于在3,300英尺深的地下水中每个立管含50,000磅浮力,以供Mariner Energy,Inc.在墨西哥湾绿色峡谷地区的King Kong / Yosemite油田开发Mexico.rn提升管从Agip Petroleumrn的“ Allegheny”张紧腿平台(TLP)上悬挂下来,在该平台上,减少了额外的处理设备和TLP安全操作所需的上升管载荷。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号