In May 2005, more than 300 farmers whose lives were affected by the dams of the power stations of Serra da Mesa and Cana Brava invaded and occupied the head office of the Inter-American Development Bank (IADB) in Brasília. The farmers wanted the Bank to force the energy company from Belgian origin, Tractebel Energia, to accelerate the indemnification process of their families regarding social, cultural and economic losses resulting from the construction of the Cana Brava’s dam at river Tocantins by the company. IADB was this project’s main financing institution. Problems like these got common in Brazil since the beginning of the nineties, when the first reforms of the power sector started, i.e. since private investment in power generation became usual. Investors (private or state owned energy companies or consortia), however, are expected by the regular process of environmental licensing conducted by environmental regulatory agencies in federal and state levels to foresee in their investment budgets and to bear compensations and indemnification payments. Nevertheless, these costs are usually underestimated as local population, which, as a rule, live in poor and underdeveloped regions in Brazil, decide to make the dam owners responsible for their social and economic needs, considering the deficient public action in their region. Therefore, this paper intends to address the first initiative conducted by the Brazilian federal government of creating a regional development fund associated to the construction of two dams in the same river, whose design process involved the main stakeholders: the local population, investors, the project financers and the government.
机译:2005年5月,300多名生活受到塞拉达梅萨(Serra da Mesa)和卡纳布拉瓦(Cana Brava)电站大坝影响的农民入侵并占领了巴西利亚美洲开发银行(IADB)的总部。农民们希望世行迫使来自比利时的能源公司Tractebel Energia加速其家人因公司Tocantins河上的Cana Brava大坝建设而造成的社会,文化和经济损失的赔偿程序。 IADB是该项目的主要融资机构。自从90年代初电力行业首次改革开始以来,即自私人投资发电以来,类似的问题在巴西就很普遍。但是,在联邦和州级环境监管机构进行的常规环境许可程序中,预计投资者(私营或国有能源公司或财团)会在其投资预算中预见并承担赔偿金和赔偿金。然而,这些成本通常被低估了,因为当地人口通常生活在巴西的贫困和欠发达地区,考虑到该地区的公共行动不足,他们决定让大坝所有者对其社会和经济需求负责。因此,本文旨在解决巴西联邦政府发起的创建区域发展基金的第一个倡议,该基金与在同一条河流中建造两个水坝有关,其设计过程涉及主要利益相关者:当地居民,投资者,项目金融家和政府。

著录项

  • 来源
  • 会议地点 Istanbul(TR)
  • 作者单位

    Ministério de Minas e Energia - Assessoria Econômica Esplanada dos Ministério bloco U sala 818 70065-900 Brasília DF Brazil Phone: +5561 3319-5303 Fax: +5561 3319-5068 e-mail: agnes.costa@mme.gov.br;

  • 会议组织
  • 原文格式 PDF
  • 正文语种
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号